13
DESIGNER/DRAFTER: CHECKED BY: PROJECT TITLE: TOWN: DRAWING TITLE: PROJECT NO. DRAWING NO. SHEET NO. Filename: SHEET NO. REVISION DESCRIPTION DATE REV. DEPARTMENT OF TRANSPORTATION STATE OF CONNECTICUT OF WORK WHICH WILL BE REQUIRED. THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND IS SHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED 12/23/2013 BLOCK: SIGNATURE/ ...\05_subset_titlesheet.dgn Border Version: 11/14/08 Plotted Date: C O N N E C T I C U T D E P A R T M E N T O F T R A N S P O R T A T I O N - - - - - - - - - - - - - - - - - - - - - - - - JB MWD TITLE SHEET NUMBER DRAWING NUMBER DRAWING INDEX OF DRAWINGS DRAWING TITLE DRAWING TITLE NORTH HAVEN, CT 06473 116 WASHINGTON AVENUE VN ENGINEERS 05 - M&PT MAINTENANCE AND PROTECTION OF TRAFFIC MPT-02 MPT-01 M&PT REHABILITATION OF BRIDGE AMTRAK & FERRY STREET NEW HAVEN MAINTENANCE AND PROTECTION OF TRAFFIC MPT-03 MAINTENANCE AND PROTECTION OF TRAFFIC MPT-04 MAINTENANCE AND PROTECTION OF TRAFFIC MPT-05 MAINTENANCE AND PROTECTION OF TRAFFIC MPT-06 MAINTENANCE AND PROTECTION OF TRAFFIC MPT-07 MAINTENANCE AND PROTECTION OF TRAFFIC MPT-08 FERRY STREET SIDEWALK CLOSURE DETAILS MPT-13 ADVANCED WARNING SIGN LOCATION PLAN MPT-10 ADVANCED WARNING SIGN LOCATION PLAN MPT-11 STATE STREET SIDEWALK CLOSURE DETAILS MPT-12 MAINTENANCE AND PROTECTION OF TRAFFIC MPT-09 MPT TITLE SHEET MPT-01 I-91 NB & SB OVER US 5, 092-0612 05.01

05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

  • Upload
    leduong

  • View
    248

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.

THE CONDITIONS OF ACTUAL QUANTITIES

IN NO WAY WARRANTED TO INDICATE

INVESTIGATIONS BY THE STATE AND IS

SHEETS IS BASED ON LIMITED

QUANTITIES OF WORK, SHOWN ON THESE

THE INFORMATION, INCLUDING ESTIMATED

12/23/2013

BLOCK:

SIGNATURE/

...\05_subset_titlesheet.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JB

MWD

TITLE SHEET

NUMBER

DRAWING

NUMBER

DRAWING

INDEX OF DRAWINGS

DRAWING TITLE DRAWING TITLE

NORTH HAVEN, CT 06473

116 WASHINGTON AVENUE

VN ENGINEERS

05 - M&PT

MAINTENANCE AND PROTECTION OF TRAFFICMPT-02

MPT-01

M&PT

REHABILITATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN

MAINTENANCE AND PROTECTION OF TRAFFICMPT-03

MAINTENANCE AND PROTECTION OF TRAFFICMPT-04

MAINTENANCE AND PROTECTION OF TRAFFICMPT-05

MAINTENANCE AND PROTECTION OF TRAFFICMPT-06

MAINTENANCE AND PROTECTION OF TRAFFICMPT-07

MAINTENANCE AND PROTECTION OF TRAFFICMPT-08

FERRY STREET SIDEWALK CLOSURE DETAILSMPT-13

ADVANCED WARNING SIGN LOCATION PLANMPT-10

ADVANCED WARNING SIGN LOCATION PLANMPT-11

STATE STREET SIDEWALK CLOSURE DETAILSMPT-12

MAINTENANCE AND PROTECTION OF TRAFFICMPT-09

MPT TITLE SHEETMPT-01

I-91 NB & SB OVER US 5,

092-0612

05.01

M. Dion
Stamp
The plans have been checked that the following tasks have been completed correctly: 1. Page Labels 2. Sheet Numbers 3. Watermarked 4. Comments Flattened 5. Digital Signature was applied allowing for markups
Page 2: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

SAND INERTIAL BARRIER ARRAY

DIRECTION OF TRAFFIC

2100 LB

2100 LB1400 LB

1400 LB1400 LB

1400 LB700 LB

700 LB

700 LB400 LB200 LB200 LB

N.T.S.

TYPE DE-9 DELINEATOR

40’ SPACING FOR 960’

INSTALL 25 TRAFFIC DRUMS AT

- 4" YELLOW (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

MAINTENANCE ANDPROTECTION OF TRAFFIC

MPT-02

NOTES:

LEGEND:

TEMPORARY PRECAST BARRIER CURB

IMPACT ATTENUATOR (DESIGNED FOR 65 MPH)

WORK AREA

TRAVEL LANE

TRAFFIC DRUM

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN

PAVEMENT MARKINGS TO REMAIN

EXISTING WHITE 10-30 SKIP

I-91 OFF RAMP

FERRY STREET

MID

DLETOW

N AVE

T.P.C.B. AT 1:11.6 TAPER

STA. 67+01

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

T.P.C.B. AT 1:10 TAPER

12’

12’

12’

12’

12’

9’ (typ) 3’(typ)

I-91 NB

40’ SPACING FOR 120’

INSTALL 4 TRAFFIC DRUMS AT

40’ SPACING FOR 120’

INSTALL 4 TRAFFIC DRUMS AT

I-91 SB

STA 66+00

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

US RO

UTE 5 (

STA

TE S

TREE

T)

SEE SEPARATE ADVANCED WARNING SIGN LAYOUT FOR SIGNAGE.5.

ITEM #9701001 - MAINTANANCE AND PROTECTION OF TRAFFIC.

FOR LANE CLOSURE DETAILS USE DETAILS LOCATED IN4.

ENGINEER IN THE FIELD.

EXACT LOCATIONS OF SIGNS TO BE VERIFIED BY THE3.

ALL CONFLICTING PAVEMENT MARKINGS SHALL BE COVERED.2.

REQUIREMENTS

PROTECTION OF TRAFFIC FOR CONSTRUCTION STAGING

PROGRESS AND ITEM #971001 - MAINTENANCE AND

SEE SPECIAL PROVISION SECTION 1.08 - PROSECTUTION1.

ADVANCE WARNING AREA.

MOUNTED DIAMOND SHAPED CONSTRUCTION SIGNS IN THE

INSTALL A BARRICADE WARNING LIGHT ON ALL POST7.

DE-7 DELINEATORS.

TEMPORARY PRECAST BARRIER CURB REQUIRES 6.

MA

TC

H

LI

NE - I91

SB

ST

A. 7

6+

00

1’

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40’

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-02_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

100’ - 3’ LANE SHIFT

65’

65’

120’ - 3’ LANE SHIFT

I-91 NB & SB OVER US 5,

092-0612

- 4" YELLOW

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 4" WHITE

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

STA. 69+34

- 8" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

STA. 66+45

- 8" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

74+00

73+0072+0071+0070+0069+0068+0067+0066+0065+00

73+0074+00

75+00

72+00

76+00

68+0069+00

70+0071+00

67+00

66+00

I-91 ON RA

MP

FE

RR

Y S

TR

EE

T

WARREN PLA

CE

RAIL

RO

AD

AMTRAK

SB RIGHT SHOULDER CLOSURE

DIRECTION OF TRAFFIC

05.02

Page 3: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

40’ SPACING FOR 960’

INSTALL 25 TRAFFIC DRUMS AT

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

MAINTENANCE ANDPROTECTION OF TRAFFIC

MPT-03

NOTES:

LEGEND:

TEMPORARY PRECAST BARRIER CURB

IMPACT ATTENUATOR (DESIGNED FOR 65 MPH)

WORK AREA

TRAVEL LANE

TRAFFIC DRUM

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN

PAVEMENT MARKINGS TO REMAIN

EXISTING WHITE 10-30 SKIP

I-91 OFF R

AMP

I-91

NB

I-91

SB

40’ SPACING FOR 80’

INSTALL 2 TRAFFIC DRUMS AT

SEE MPT-02 FOR NOTES1.

MA

TC

H

LI

NE - I91

SB

ST

A. 7

6+

00

1’

12’

12’

12’

12’

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40’

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-03_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

STA. 82+29

65’

100’ - 3’ LA

NE SHI

FT

I-91 NB & SB OVER US 5,

092-0612

- 4" YELLOW (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 4" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

81+03

.65

81+00

80+00

79+00

78+00

77+00

76+00

75+00

76+00

77+00

78+00

79+00

80+00

81+00

81+94

I-91

ON RAMP

SB RIGHT SHOULDER CLOSURE

05.03

Page 4: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

40’ SPACING FOR 1120’

INSTALL 29 TRAFFIC DRUMS AT

- 8" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

MAINTENANCE ANDPROTECTION OF TRAFFIC

MPT-04

LEGEND:

TEMPORARY PRECAST BARRIER CURB

IMPACT ATTENUATOR (DESIGNED FOR 65 MPH)

WORK AREA

TRAVEL LANE

9’ (typ) 3’(typ)

TRAFFIC DRUM

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN

PAVEMENT MARKINGS TO REMAIN

EXISTING WHITE 10-30 SKIP

I-91 OFF RAMP

FERRY STREET

MID

DLETOW

N AVE

STA. 63+15

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

12’

12’

12’

12’

12’

I-91 NB

40’ SPACING FOR 240’

INSTALL 7 TRAFFIC DRUMS AT

I-91 SB

STA 66+37

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

152’

NOTES:

SEE MPT-02 FOR NOTES1.

US RO

UTE 5 (

STA

TE S

TREE

T)

T.P.C.B. AT 1:10 TAPER

MA

TC

H

LI

NE - I91

SB

ST

A. 7

5+

00

1’

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40’

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-04_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

I-91 ON RA

MP

WARREN PLA

CE

RAIL

RO

AD

AMTRAK

STA.69+12

233’ - 7’ LANE SHIFT

I-91 NB & SB OVER US 5,

092-0612

- 4" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 4" YELLOW (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

STA. 66+45

- 8" WHITE

PAVEMENT MARKING TAPE

START TEMPORARY PLASTIC

- 4" WHITE

PAVEMENT MARKING TAPE

END TEMPORARY PLASTIC

- 4" WHITE

PAVEMENT MARKING TAPE

END TEMPORARY PLASTIC

73+0072+0071+0070+0069+0068+0067+0066+0065+00

64+00

63+00

62+00

73+0074+00

75+00

72+00

68+0069+00

70+0071+00

67+00

66+0065+00

64+00

63+00

FE

RR

Y S

TR

EE

T

SB LEFT SHOULDER CLOSURE

05.04

Page 5: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

SAND INERTIAL BARRIER ARRAY

DIRECTION OF TRAFFIC

2100 LB

2100 LB1400 LB

1400 LB1400 LB

1400 LB700 LB

700 LB

700 LB400 LB200 LB200 LB

N.T.S.

TYPE DE-9 DELINEATOR

40’ SPACING FOR 960’

INSTALL 25 TRAFFIC DRUMS AT

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

MAINTENANCE ANDPROTECTION OF TRAFFIC

MPT-05

NOTES:

LEGEND:

TEMPORARY PRECAST BARRIER CURB

IMPACT ATTENUATOR (DESIGNED FOR 65 MPH)

WORK AREA

TRAVEL LANE

TRAFFIC DRUM

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN

PAVEMENT MARKINGS TO REMAIN

EXISTING WHITE 10-30 SKIP

I-91 OFF R

AMP

I-91

NB

I-91

SB

12’

12’

12’

12’

SEE MPT-02 FOR NOTES1.

T.P.C.B. AT 1:10 TAPER

MA

TC

H

LI

NE - I91

SB

ST

A. 7

5+

00

3’

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40’

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-05_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

STA. 81+85

STA. 76+63

150’

230’ -

7’ LANE S

HIFT

I-91 NB & SB OVER US 5,

092-0612

- 4" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 4" YELLOW (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

81+03

.65

81+00

80+00

79+00

78+00

77+00

76+00

75+00

74+00

75+0076+00

77+00

78+00

79+00

80+00

81+00

81+94

I-91

ON RAMP

SB LEFT SHOULDER CLOSURE

DIRECTION OF TRAFFIC

05.05

Page 6: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

SAND INERTIAL BARRIER ARRAY

DIRECTION OF TRAFFIC

2100 LB

2100 LB1400 LB

1400 LB1400 LB

1400 LB700 LB

700 LB

700 LB400 LB200 LB200 LB

N.T.S.

TYPE DE-9 DELINEATOR

- 4" YELLOW (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 8" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

MAINTENANCE ANDPROTECTION OF TRAFFIC

MPT-06

LEGEND:

TEMPORARY PRECAST BARRIER CURB

IMPACT ATTENUATOR (DESIGNED FOR 65 MPH)

WORK AREA

TRAVEL LANE

9’ (typ)

3’(typ)

TRAFFIC DRUM

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN

PAVEMENT MARKINGS TO REMAIN

EXISTING WHITE 10-30 SKIP

STA. 57+96

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

T.P.C.B. AT 1:10 TAPER

12’

12’

12’

12’

12’

I-91

NB

I-91 SB

STA 53+15

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

NOTES:

SEE MPT-02 FOR NOTES1.

I-91

ON RAMP

BLATCHLEY AVEN

UE

US RO

UTE 5 (S

TATE S

TREE

T)

40’ SPACING FOR 1160’

INSTALL 30 TRAFFIC DRUMS AT

MA

TC

H

LI

NE - I91

NB

ST

A. 6

5+

501’

I-91 O

N RAM

P

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40’

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-06_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

230’ -

7’ LA

NE SHI

FT

150’

STA. 60+32

STA. 56+96

I-91 NB & SB OVER US 5,

092-0612

- 4" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 4" YELLOW (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

58+00

65+0064+00

63+00

62+00

61+00

60+00

59+00

57+00

56+00

55+00

54+00

53+00

66+0065+00

64+00

63+00

62+00

61+00

60+00

59+00

58+00

57+00

56+00

55+00

NB LEFT SHOULDER CLOSURE

DIRECTION OF TRAFFIC

05.06

Page 7: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

STA. 80+85

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

40’ SPACING FOR 680’

INSTALL 17 TRAFFIC DRUMS AT

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

MAINTENANCE ANDPROTECTION OF TRAFFIC

MPT-07

NOTES:

LEGEND:

TEMPORARY PRECAST BARRIER CURB

IMPACT ATTENUATOR (DESIGNED FOR 65 MPH)

WORK AREA

TRAVEL LANE

TRAFFIC DRUM

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN

PAVEMENT MARKINGS TO REMAIN

EXISTING WHITE 10-30 SKIP

I-91 OFF RAMP

I-91 N

B

I-91 SB

12’

12’

12’

12’

SEE MPT-02 FOR NOTES1.

FERRY STREET M

IDDLE

TOWN

AVE

US RO

UTE 5 (

STA

TE S

TREE

T)

MA

TC

H

LI

NE - I91

NB

ST

A. 6

5+

50

2’

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40’

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-07_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

STA. 75+12

RAIL

RO

AD

AM

TR

AK

I-91 NB & SB OVER US 5,

092-0612

- 4" YELLOW (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 4" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

MA

TC

H

LI

NE - I91

NB

ST

A. 7

6+

50

MA

TC

H

LI

NE - I91

NB

ST

A. 7

6+

50

154’232’ - 7’ LANE SHIFT

- 4" YELLOW (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 4" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

81+03.6581+0080+0079+0078+0077+00

78+00

79+0080+00 81+00 81+94

76+00

75+00

74+00

73+0072+0071+0070+0069+0068+0067+0066+00

73+0074+00

75+00

72+00

76+00

77+00

68+0069+00

70+0071+00

67+00

FE

RR

Y S

TR

EE

T

NB LEFT SHOULDER CLOSURE

NB LEFT SHOULDER CLOSURE

05.07

Page 8: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

SAND INERTIAL BARRIER ARRAY

DIRECTION OF TRAFFIC

2100 LB

2100 LB1400 LB

1400 LB1400 LB

1400 LB700 LB

700 LB

700 LB400 LB200 LB200 LB

N.T.S.

TYPE DE-9 DELINEATOR

STA. 58+42

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

- 8" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

END STA. 58+90

- 4" YELLOW (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

MAINTENANCE ANDPROTECTION OF TRAFFIC

MPT-08

LEGEND:

TEMPORARY PRECAST BARRIER CURB

IMPACT ATTENUATOR (DESIGNED FOR 65 MPH)

WORK AREA

TRAVEL LANE

9’ (typ)

3’(typ)

TRAFFIC DRUM

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN

PAVEMENT MARKINGS TO REMAIN

EXISTING WHITE 10-30 SKIP

T.P.C.B. AT 1:10 TAPER

I-91

NB

I-91 SB

NOTES:

SEE MPT-02 FOR NOTES1.

I-91

ON RAMP

BLATCHLEY AVEN

UE

US RO

UTE 5 (S

TATE S

TREE

T)

40’ SPACING FOR 560’

INSTALL 15 TRAFFIC DRUMS AT

MA

TC

H

LI

NE - I91

NB

ST

A. 6

5+

50

1’

VARIES

12’

12’

12’

I-91 O

N RAM

P

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40’

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-08_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

STA. 60+31

I-91 NB & SB OVER US 5,

092-0612

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

58+00

65+0064+00

63+00

62+00

61+00

60+00

59+00

57+00

56+00

55+00

54+00

53+00

66+0065+00

64+00

63+00

62+00

61+00

60+00

59+00

58+00

57+00

56+00

55+00

NB RIGHT SHOULDER CLOSURE

DIRECTION OF TRAFFIC

05.08

Page 9: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

40’ SPACING FOR 120’

INSTALL 4 TRAFFIC DRUMS AT

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

MAINTENANCE ANDPROTECTION OF TRAFFIC

MPT-09

NOTES:

LEGEND:

TEMPORARY PRECAST BARRIER CURB

IMPACT ATTENUATOR (DESIGNED FOR 65 MPH)

WORK AREA

TRAVEL LANE

TRAFFIC DRUM

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN

PAVEMENT MARKINGS TO REMAIN

EXISTING WHITE 10-30 SKIP

I-91 OFF RAMP

STA. 73+61

MATCH TO EXISTING

LIMIT OF TEMP PAVEMENT MARKINGS

I-91

NB

I-91 S

B

11’

12’

12’

12’

SEE MPT-02 FOR NOTES1.

FERRY STREET M

IDDLE

TOWN

AVE

US RO

UTE 5 (

STA

TE S

TREE

T)

MA

TC

H

LI

NE - I91

NB

ST

A. 6

5+

50

2’

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

SCALE 1"=40’

40 800

SCALE IN FEETOF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-09_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

RAIL

RO

AD

AMTRAK

STA. 67+08

I-91 NB & SB OVER US 5,

092-0612

- 6" WHITE (TYP.)

PAVEMENT MARKING TAPE

TEMPORARY PLASTIC

77+00

76+00

75+00

74+00

73+0072+0071+0070+0069+0068+0067+0066+00

73+0074+00

75+00

72+00

76+00

77+00

78+00

68+0069+00

70+0071+00

67+00

FE

RR

Y S

TR

EE

T

NB RIGHT SHOULDER CLOSURE

05.09

Page 10: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

G

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

LEGEND:

SIGNING LEGEND:

ADVANCED WARNING SIGN

LOCATION PLAN

POST MOUNTED SIGN

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN 092-0612

MPT-10

END

ROAD WORK

ROAD

WORK

AHEAD

INSTALL 31-1906 POST MOUNTED

INSTALL 80-9612 POST MOUNTED

B

G

A INSTALL SERIES 16E SIGN

CONSTRUCTIONAHEAD

ROAD USE RESTRICTED

STATE LIABILITY LIMITED

GENERAL STATUTES SEC 13a-115, 13a-145

COMMISSIONER OF TRANSPORTATION

ADVANCED WARNING SIGN LAYOUT - SOUTHBOUND

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-10_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

SEE MPT-02 FOR NOTES1.

NOTES:

C

C

G

A

AHEAD

ROAD WORK

DOUBLED

FINES

CLOSED

SHOULDER

C INSTALL 80-9604 POST MOUNTED

D INSTALL 80-995 POST MOUNTED

SCALE = 1"=300’

D

D

B

1500’

1500’

1000’

500’

BRIDGE # 03021

I-91 NB & SB OVER US 5,

DRIV

E

RO

CK

ST.

GRACES

T.

ST.

VIE

W

RID

GE

ST.

WARREN

PL.

CE

DAR

HIL

L

MAY

ST.AVE.

L

DR.

ST.

BANKST.

NO. ST.

ST.

ST.

ST.WILLOW

ST.

ST.

ST.

ST.

#1 STATE

ST.

#2

ST.

LYMAN

ST.

FERRYS

T. MID

DLETOWN

FA

WN

ST.

CLIN

TO

N

FOXST.

DOVER

ST.AT

WA

TE

R

RO

WE

ENGLISH

ST.

ST.

ST.

#2

ST. #1

MA

LT

BY

ST.

BL

AT

CH- LE

Y

ST.

AVE.

DU

MP

RD. DO

STATE

ST.

ST

AT

E

FOXON

80

5

91

8

7

6

RAILRO

AD

RI

V

ER

C

WILCOXPL.

PA

RK P

L.M

EC

HA

NIC

L

BAILEY

6

MID

DLET

OW

N

MIDDLETOWN

AVE.

ST.

DO

WNIN

G

BE

AC

H

VIE

W

LA.

DEL RIO DR.

17

FR

ONT

JOHN -MAILLIW

SO

N

RD.

B

05.10

Page 11: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWD

LEGEND:

SIGNING LEGEND:

ADVANCED WARNING SIGN

LOCATION PLAN

POST MOUNTED SIGN

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN 092-0612

MPT-11

END

ROAD WORK

ROAD

WORK

AHEAD

INSTALL 31-1906 POST MOUNTED INSTALL 80-9612 POST MOUNTEDB G

A INSTALL SERIES 16E SIGN

CONSTRUCTIONAHEAD

ROAD USE RESTRICTED

STATE LIABILITY LIMITED

GENERAL STATUTES SEC 13a-115, 13a-145

COMMISSIONER OF TRANSPORTATION

ADVANCED WARNING SIGN LAYOUT - NORTHBOUND

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-11_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

SEE MPT-02 FOR NOTES1.

NOTES:

BRIDGE #03021

AHEAD

ROAD WORK

DOUBLED

FINES

CLOSED

SHOULDER

C INSTALL 80-9604 POST MOUNTED

D INSTALL 80-995 POST MOUNTED

SCALE = 1"=300’

C

C

G

C

C

B

D

D

A

BB

C

C

B

B

D

D

B

A

A

1500’

500’

1000’

1000’

500’500’

500’

I-91 NB & SB OVER US 5,

91E

E

INSTALL 80-9612 POST MOUNTEDEROAD

NARROWS

ST.

OR

AN

GE

PEARL

WARREN

PL.

CE

DAR

MAY

ST.AVE.

ST.

ST.

EDWARDS

EAGLE

ST.

ST.

ST.

ST.

FOSTER

NIC

OLL

NAS

H #1 STATE

ST.

#2

ST.

HINES

PL

ST.

ST.

ST.

ST.

ST.

ST.

CLARK

ST.

ELD

#1

BO

RN

OS-

FERRYS

T. MID

DLETOWN

FOXST.

DOVER RO

WE

ENGLISH

PECK

ST. #1

PINEST.

#1

GRAFTON

ST.LIMERICK

CHATHAM

FE

RR

Y

LOMBARD

FIL

LM

OR

E

PO

PL

AR

BL

AT

CH- LE

Y

PEC

K MO

NR

OE

MAIN

LOMBARD

JA

MES

ALTONALTON

ST.ST.

ST.

ST.

#1

ST.ST.

PINE

AV

E.

CLAY

ST. #2

ST.

ST.

RIV

ER

#1

HUMPHREY

WALNUT ST.

MIL

L

MURPHY DR.JOHN W.

JO

HN

W.

MU

RP

H

MARKET

CASTLE

CLAYST. #1

HA

VE

N

ST.

FR

AN

KLIN

HA

MIL

TO

N

ST.

STATE 5

6

5

4

3

3

RAIL

RO

AD

Rive

r

BEECHST.

ME

CH

ANIC

LIVIN

G- ST

ON

PLE

A- S

ANT

ST.

6

ST.

05.11

Page 12: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWDMPT-12

(NOT TO SCALE)

LEGEND:

TYPE III BARRICADE WITH SIGN

PEDESTRIAN DETOUR ROUTE

TRAVEL DIRECTION

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN 092-0612

(NOT TO SCALE)

STATE STREET SIDEWALKCLOSURE DETAILS

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-12_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

I-91 NB & SB OVER US 5,

80-9075L

3

SIDEWALK CLOSED

CROSS HERE

I-91 OFF R

AMP

CONC. WALK

80-9075R

80-9075L

WEST SIDEWALK CLOSURE

I-91 NB

CONC. WALK

I-91 SB

I-91 NB

CONC. WALK

CONC. WALKI-9

1 OFF R

AMP

I-91 SB

EAST SIDEWALK CLOSURE

NOTES:

ITEM #9701001 - MAINTANANCE AND PROTECTION OF TRAFFIC.

FOR LANE CLOSURE DETAILS USE DETAILS LOCATED IN1.

US ROUTE 5 (STATE STREET)

US ROUTE 5 (STATE STREET)

SEE MPT-02 FOR NOTES.2.

1

2

SIDEWALK CLOSED

CROSS HERE

SIDEWALK CLOSED

CROSS HERE

66+00

65+00

64+00

63+00

62+00

68+00

69+00

67+00

66+00

I-91

ON

RA

MP

BLATC

HLE

Y

AVE

NU

E

WIL

LO

W

ST

RE

ET

WIL

LO

W

ST

RE

ET

BLATC

HLE

Y

AVE

NU

E

I-91

ON

RA

MP

80-9075R

4

SIDEWALK CLOSED

CROSS HERE66+

00

65+00

64+00

63+00

62+00

68+00

69+00

67+00

66+00

05.12

Page 13: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

- -

-

-

-

- -

- - -

- - - -

- - -

- - -

- - - - JLB

MWDMPT-13

LEGEND:

TYPE III BARRICADE WITH SIGN

PEDESTRIAN DETOUR ROUTE

TRAVEL DIRECTION

REHABILATATION OF BRIDGE

AMTRAK & FERRY STREET

NEW HAVEN 092-0612

FERRY STREET SIDEWALKCLOSURE DETAILS

DESIGNER/DRAFTER:

CHECKED BY:

PROJECT TITLE: TOWN:

DRAWING TITLE:

PROJECT NO.

DRAWING NO.

SHEET NO.

Filename:SHEET NO.REVISION DESCRIPTIONDATEREV.

DEPARTMENT OF TRANSPORTATION

STATE OF CONNECTICUT

OF WORK WHICH WILL BE REQUIRED.THE CONDITIONS OF ACTUAL QUANTITIES IN NO WAY WARRANTED TO INDICATE INVESTIGATIONS BY THE STATE AND ISSHEETS IS BASED ON LIMITED QUANTITIES OF WORK, SHOWN ON THESE THE INFORMATION, INCLUDING ESTIMATED

SCALE AS NOTED

12/23/2013

BLOCK:

SIGNATURE/

...\TR_MSH_MPT-13_092_162.dgn

Border Version: 11/14/08

Plotted Date:

CONNECTICU

T

DE

PA

RT

ME

NT

O F TRANS

PO

RT

ATI

ON

I-91 NB & SB OVER US 5,

(NOT TO SCALE)

(NOT TO SCALE)

CONC. WALK

I-91

NB

CONC. WALK

I-91 S

B

FER

RY STREET

MID

DLE

TO

WN

AVE

I-91

NB

I-91 S

B

CONC. WALK

MID

DLE

TO

WN

AVE

CONC. WALK

FER

RY STREET

NOTES:

ITEM #9701001 - MAINTANANCE AND PROTECTION OF TRAFFIC.

FOR LANE CLOSURE DETAILS USE DETAILS LOCATED IN1.

SEE MPT-02 FOR NOTES.2.

80-9075L

2

80-9075R

1

SIDEWALK CLOSED

CROSS HERE SIDEWALK CLOSED

CROSS HERE

73+

00

72+

00

73+

00

74+

00

75+

00

I-91

ON

RA

MP

FERRY

STREET

DO

VE

R

ST

RE

ET

DO

VE

R

ST

RE

ET

I-91

ON

RA

MP

FERRY

STREET

80-9075L

3

80-9075R

1

SIDEWALK CLOSED

CROSS HERE

SIDEWALK CLOSED

CROSS HERE

WEST SIDEWALK CLOSURE

EAST SIDEWALK CLOSURE

73+

00

72+

00

73+

00

74+

00

75+

00

05.13

Page 14: 05 - M&PT - CT.GOV-Connecticut's Official State Website INERTIAL BARRIER ARRAY DIRECTION OF TRAFFIC 2100 LB 1400 LB 2100 LB 1400 LB 1400 LB 700 LB 1400 LB 700 LB 200 LB 200 LB 400

– For Internal CTDOT Use Only Discipline Subset Submittal Checklist

The following check list shall be checked and attached to each discipline subset *

prior to being digitally signed.

Check Task Section in DPD Manual

1. Attach this checklist to the discipline subset. Section 3.1

2. Complete the following tasks using Bluebeam on

the discipline subset?

a. Apply Page Labels Section 1.6.2

b. Apply Sheet Numbers Section 1.6.2

c. Apply Watermark Section 2.4

d. Flatten Markups Section 2.4

e. Digital Signature Field Section 2.5.1

3. Type name and telephone number below. 4. Consultants using Thin Client Only

Engineer of Record digitally sign the plans.

5. Upload, if not in Projectwise already, the

discipline subset into the 100_Contract_Plans folder in Projectwise and attribute the document

correctly?

Section 3.2.4

a. Discipline = CT

b. Main Category = CON

c. Sub Category = FDP, DCD, DCD2,

ADP, ACD, DCO where applicable d. Label = subset number and name.

Example of highways subset would be 03-Highways.

The label for a subset shall be the

same for both FDP and DCD submittals.

Addendum submittals shall match FDP submittals with the addition of “_A#”.

Change Order Submittals shall match FDP submittals with the addition of “_C#”. e. Description field is filled in with

a description of the subset. f. The applicable bridge no.(s) or signal

intersection(s) were selected that is/are associated with this subset.

6.CTDOT Engineers or Consultants Using Thick Client Forward link to Engineer of Record for Digital Signature

7. Apply the QA/QC stamp after the discipline subset has been digitally signed.

Section 3.1

I have performed and checked that all the tasks above were performed correctly.

Submitted By (Type in Name) Phone Number (Type in Phone Number)

* Discipline subset includes the General subset and all other discipline subsets. The 02­Revisions does not needa checklist attached. The standard subsets already have a checklist attached to the index sheets.