1
GZA GEOENVIRONMENTAL, INC.1 EDGEWATER DRIVENORWOOD, MA 02062
AUTHOR/PRESENTER: ERIC P. BREGMAN
OWNER: Massachusetts Water Resources Authority (MWRA)
CONTRACTOR: Barletta Heavy Division
GZA GEOENVIRONMENTAL : Geotech ConsultantContractor Support Services
PROJECT TIMELINE: 2008 – 2009
PROJECT LOCATION: East Boston, MA
PROJECT COST: $50 Million
2
PURPOSE:
Upgrade & Improve Existing Local Sewer System Capacity
Reduce Discharge Into Boston Harbor & Chelsea Creek By 40 Million Gallons Annually (90% Reduction)
GOAL: Comply with Federal Clean Water Act of 1972
SCOPE: 11,800 LF of 36” to 66” Micro-tunnelCSO Relief Piping
DESIGN SERVICES:
Structural & Geotechnical Engineering • 20 Deep Structure Shafts• 8-ft Wide x 96-ft Long Trench Support Design• MBTM Jacking Thrust Blocks
Aerial View of Project SiteREF: Google Maps (Satellite View)
3
BENEFITS OF RE-SEQUENCING SHAFT CONSTRUCTION
• Reduced Number of MBTM Mobilizations
• Eliminated Five (5) Shafts
• Expedited Shaft Installation Increased Efficiency
• Resulted In Schedule and Cost Savings
BENEFITS OF SELECTING THE RIGHT EQUIPMENT
• AVN Model Automatic Tunneling Machine and Hydraulic Pipe Jacking Drive Unit
• Many of the Required Shaft Sizes Were Reduced
GROUND CONDITIONS & SITE CONSTRAINTS:
Contaminated Soils& Groundwater
Existing Utilities
Headroom Restrictions
Tie-ins to Existing Sewer
Structures
Difficult Ground Conditions
• Wide Variations inthe Soil Strata
Stability of Nearby Structures
4
TRENCHLESS TECHNOLOGIES (MBTM)
Greatly Reduces Local Impact ToCommunity & Environment
Construction Related Traffic
Construction Related Pollution
(Sight, Noise, Air, Water, Etc.)
GEOTECHNICAL & STRUCTURAL CONSULTING SERVICES:
Eleven (11) Impermeable Shafts
Interlocking Drilled Secant Piles
Steel Sheet Piles
Jet Grout Invert Seals, Plugs & Ground Improvement
5
GEOTECHNICAL & STRUCTURAL CONSULTING SERVICES:
Soldier Piles & Lagging
Drilled Micro-Piles & Contact Lagging
Reinforced Concrete Thrust Blocks
DRILLED SOLDIER PILE & LAGGING SHAFTS
40-ft Deep Max.
Groundwater Table
30-ft Above BOE
15-ft of Native Fill
atop Glacio Marine Clay
Clay Extended
Below BOE
Local Sumping
Numerous
Underground Utilities
Speed, Precision &
Ease of Construction
6
CIRCULAR SHEET PILE SHAFTS
31-ft Deep Max.
Groundwater Table 25-ft Above BOE
15-ft of Native Fill atop Organics Over Glacio Marine Clay (w/ Sand Lenses)
CIRCULAR SHEET PILE SHAFTS
Jet Grout Invert Plug
Reduced Treatment of Contaminated
Groundwater
CIP Reinforced Concrete Ring Beams
Limited Groundwater Treatment and
T & D of Contaminated Soils
7
DRILLED MICRO-PILE & CONTACT LAGGING SHAFTS
Low Headroom
Proximity to Utilities & Structures
Restricted Work Hours in Residential Area
Low Profile Track Mounted Drill Rig w/ Articulating Mast
DRILLED MICRO-PILE & CONTACT LAGGING SHAFTS
Accurately Locate & Install Vertical Support Members
9-5/8”Φ x 1/2” Wall Flush Joint Steel Casing
Contact Lagging Designed
Avoided Existing Utilities
Reduced Vibrations Typical of Pile Driving
8
CIRCULAR SECANT PILE SHAFTS
45-ft Deep Max.
Groundwater
Table 39-ft
Above BOE
9-ft of Native Fill
Atop Glacio Marine
Clay to Below BOE
Contaminated
Groundwater & Soil
Water-Tight
Impermeable Design
CIRCULAR SECANT PILE SHAFTS
Technically Innovative
Interlocking Primary &
Secondary Secant
Piles Design
1 Meter Diameter (3’-3”)
Drilled Steel Casing
14-ft to 27-ft Inside
Diameter of Shaft
9
CIRCULAR SECANT PILE SHAFTS
Quantity of Secants a Function of MBTM
Size (Overall Shaft Diameter) & Min.
Required Wall Thickness
22 to 38 Secants
Required w/
Center-to-Center
Spacing of 2’-6”
9” Min. Wall
Thickness
2500 PSI
Rapid Curing Concrete
CIRCULAR SECANT PILE SHAFTS
Stresses Due to Overburden & Surcharge Transmitted & Distributed Along
Circumference of Shaft
Hoop Stresses Acted as Compression Force
Lateral Earth Pressures of 4500 PSF (278 PSI) Across 25-in Secant Overlap
10
CIRCULAR SECANT PILE SHAFTS
Quality Control & Installation Techniques of Contractor
No Bracing Due to Geometric Properties (Arching Effect)
Reduction in Shaft Diameter, Construction Material & Excavation Quantity
400% Increase in Efficiency & Speed of Continuous Excavation
PRACTICAL ADVANTAGES RECOGNIZED
Innovative & Constructible Solutions for Deep Shaft Design
Flexible Design Approach
Minimized Impact to Surrounding Residential Urban Environment
Construction Efficiency
Schedule & Cost Savings Resulting From:
• Reduction in Shaft Quantity & Size
• Limit Bracing Required
• Contaminated Groundwater and Soil Treatment & Disposal
11
Barletta Heavy Division, Inc. of Canton, MA (General Contractor)
Cruz Contractors, LLC of Holmdel, NJ (Micro-Tunneling Sub-Contractor)
Hayward Baker of Providence, RI (Specialty Sub-Contractor)
Herrenknect AG of Germany (Micro-Tunneling Equipment Manufacturer)