8
Growth and regeneration in the Thames Gateway SOUTH ESSEX NORTH KENT

Thames Gateway

Embed Size (px)

DESCRIPTION

economic geography - thames gateway

Citation preview

Page 1: Thames Gateway

Growth and regeneration in the Thames Gateway

SOUTH ESSEX

NORTH KENT

Page 2: Thames Gateway

A 21 ST CENTURY SOLUTION TO THE PROBLEMS OF LONDONS GROWTH. HOUSING, TRANSPORT, INDUSTRY, BUSINESS TO BE ALLOWED TO GROW IN A SECTOR EAST ALONG THE THAMES

Page 3: Thames Gateway

THE SCHEME INVOLVES USING GREEN BELT LAND TO THE EAST, DESTROYING THIS AND FRAGILE ENVIRONMENTS LIKE THE SHEARNESS MARSH

A NEW BUSINESS PARK AT BEAM REACH TO HAVE MANUFACTURING , WAREHOUSING, RESEARCH AND HIGH TECH INDUSTRIES

THE NEW LONDON GATEWAY PORT , INDUSTRIAL AND BUSINESS PARK AT SHELLHAVEN

Page 4: Thames Gateway

UP TO 100,000 NEW HOMES, MIXED ESTATES, WITH SUSTAINABLE QUALITIESSUCH AS GREENWICH MILLENIUM VILLAGE

INDUSTRIAL AND BUSINESS PARKS

TRANSPORT IMPROVEMENTS INCLUDING A 6 LANE BRIDGE

LINKS TO THE EAST LONDON 2012 OLYMPICS

Page 5: Thames Gateway
Page 6: Thames Gateway

Beam reach business park

Page 7: Thames Gateway

INVOLVES USING GREENFIELD AND BROWNFILED SITES. MARSHKLAND HABITATS AND RARE SPECIES OF BRDS MAY BE ENDANGERED.NEW ROADS AND INDUSTRY BRING POLLUTION, CONGESTIONIS THIS A SUSTAINABLE ANSWER?

Page 8: Thames Gateway

The gateway is just one of the proposed sectors of growth

M4 corridor to south Wales

M11 corridor to Cambridge

Towards Milton Keynes new town/city