Side Stream Filtration Case Study
Chelsea Football Club
Side Stream Filtration Case Study Chelsea FC
2
Side Stream Filtration for Chiller
Upgrade at Chelsea Football Club.
Client: Chelsea Football Club
Date: 2012
Building: West Stand- London
Sector: Sports & Entertainment
3
ABOUT THE PROJECT
The aim of the project was to improve the quality of the air supply to the West
Stand and the comfort of Chelsea Football Club’s corporate hospitality clients.
PROJECT CHALLENGES
As part of stadium re-development new heating and cooling systems were
installed to improve the quality of air supply to the West Stand and the comfort of
the corporate hospitality clients.
This involved replacing old pipework which had deteriorated due to contamination
and wear. The value of Side Stream filtration for controlling debris and biofilm in
the closed loop systems was fully evaluated and it was decided that the benefits
in supporter comfort justified implementation.
To ensure maximum performance a fully boosted pump system was installed on
the condenser circuit to minimise fluid loss from the circuit.
Side Stream Filtration Case Study
4
“The Project was delivered on time, to budget
and corporate hospitality has been significantly
improved to the benefit of all.”
Site Project Manager
What the client said:
Products used for this project:
5
Contact us
6
Amazon Filters Ltd.
Albany Park Estate, Frimley Road
Camberley, Surrey
GU16 7PG
UK
Tel: +44 (0) 1276 670600
Email: [email protected]
Visit our website:
www.amazonfilters.com
Visit our blog:
www.amazonfilters.com/blog
Connect with us on social media: