Side Stream Filtration Case Study

State Street Bank Critical Data Centre

Page 2: Side Stream Filtration Case Study State Street Bank Critical Data Centre

Side Stream Filtration Case Study State Street Bank

2

Side Stream Filtration for State Street Bank

Client: State Street Bank

Date: 2012

Building: Canary Wharf - London

Sector: Financial Services

Page 3: Side Stream Filtration Case Study State Street Bank Critical Data Centre

3

ABOUT THE PROJECT

Chilled Water (CHW) and Low Temperature Hot Water (LTHW) Side Stream filters

were specified by State Street Bank to ensure accurate temperature control

at their high profile data centre.

The CHW system volume was unusually large and contained in excess of 200,000

litres of fluid. One part of the circuit was classified ‘Critical’, therefore required

the installation of a booster pump to ensure zero fluid loss and to maintain

maximum operating efficiency. Duplicate filter housings were fitted in parallel for

the primary circuit to ensure optimum cleanliness of the bulk fluid.

PROJECT CHALLENGES

Due to the critical nature of this building the use of special flushing filters were

required to ensure a high level of cleanliness within the system before fitting

operational filter cartridges.

Access to the plant room was only possible for a limited period of time and

therefore meeting project deadlines was vital to its successful completion.

Side Stream Filtration Case Study

Page 4: Side Stream Filtration Case Study State Street Bank Critical Data Centre

4

“Amazon manufactured and delivered filters on

time to ensure project deadlines were met. This

was particularly vital with limited site access

to the data centre. Amazon Filters has also

continued to provide a high level of on-site

support to help ensure efficient operation of

the installed equipment and therefore the

critical environment management systems.”

Site Project Manager

What the client said: