22° IPMA World Congress “Project Management to Run” 9-11 November 2008, Rome, Italy Selecting the right project management approach using 6P Tahir Hanif MSc MCIOB MAPM MACostE MIBC CMC MRICS PhD research student – Kingston University London / Project Controls Manager CH2M Hill Professor Mukesh Limbachiya BE MSc PhD CSci CEng FIMS MICE MIMMM MCS MICT Head of School, Faculty of Engineering / Sustainable Technology Research Centre Director – Kingston University London 1-3 November 2010, Istanbul, Turkey 24 th IPMA World Congress www.ipma2010.com

IPMA Presentation

Embed Size (px)

Citation preview

Page 1: IPMA Presentation

Selecting the right project management approach using 6P

Tahir Hanif MSc MCIOB MAPM MACostE MIBC CMC MRICS

PhD research student – Kingston University London / Project Controls Manager CH2M Hill

Professor Mukesh Limbachiya BE MSc PhD CSci CEng FIMS MICE MIMMM MCS MICT

Head of School, Faculty of Engineering / Sustainable Technology Research Centre Director – Kingston University London

1-3 November 2010, Istanbul, Turkey

24th IPMA World Congresswww.ipma2010.com

Page 2: IPMA Presentation

Presentation outline

o Introduction & backgroundo The Problemo The Solutiono How SixP workso Conclusion(s)o Questions / Answers

24th IPMA World Congresswww.ipma2010.com

Page 3: IPMA Presentation

Background

“Project management is not rocket science. It's all about delivering a project on time, on budget, to specification and to a good quality with zero defects. We all know what to do, it's just having sufficient time to do it all properly which is never the case.”

(One of many comments received from a questionnaire survey, 2008)

24th IPMA World Congresswww.ipma2010.com

Page 4: IPMA Presentation

Perceptions from the PM community

24th IPMA World Congresswww.ipma2010.com

(Questionnaire survey, 2008)

Page 5: IPMA Presentation

The SixP framework

24th IPMA World Congresswww.ipma2010.com

Design

Develop

Customise

Implement

Maintain

Page 6: IPMA Presentation

24th IPMA World Congresswww.ipma2010.com

ADAPTIVE

PREDICTIVE

DUCE KRUE

DynamicUncertainComplexEnvironment

KnownRegularUniformEnvironment

Project Management thinking

Basis of remuneration(Consultants / Contractors /Suppliers)

Cost reimburseable Fixed priced

1.UNDERSTAND project driver(s)

2.SELECT method

3.IMPLEMENT method

4.MONITOR method

5.ADJUST as required

6.CLOSE out

Page 7: IPMA Presentation

24th IPMA World Congresswww.ipma2010.com

1.UNDERSTAND project driver(s)

2.SELECT method

3.IMPLEMENT method

4.MONITOR method

5.ADJUST as required

6.CLOSE out

Page 8: IPMA Presentation

24th IPMA World Congresswww.ipma2010.com

1 2 3 4

End to end process

Manager 1

Manager 2

Project Manager

Manager 3

1

2

3

41

2

3

4

Project requirement

Client requirement

Standards requirement

1.UNDERSTAND project driver(s)

2.SELECT method

3.IMPLEMENT method

4.MONITOR method

5.ADJUST as required

6.CLOSE out

Page 9: IPMA Presentation

24th IPMA World Congresswww.ipma2010.com

Monitoring

Independant

Assessment

Key Performance Indicies

(KPIs)

Workshops

Project Reports

Tracking against

deliverables

1.UNDERSTAND project driver(s)

2.SELECT method

3.IMPLEMENT method

4.MONITOR method

5.ADJUST as required

6.CLOSE out

Page 10: IPMA Presentation

24th IPMA World Congresswww.ipma2010.com

Project requirement

Client requirement

Standards requirement

Manager 1

Manager 2

Project Manager

Manager 3

1.UNDERSTAND project driver(s)

2.SELECT method

3.IMPLEMENT method

4.MONITOR method

5.ADJUST as required

6.CLOSE out

X

X

X

Page 11: IPMA Presentation

24th IPMA World Congresswww.ipma2010.com

Review of the project

Workshops

One to One

interviews

Case study / Close Out

Report

1.UNDERSTAND project driver(s)

2.SELECT method

3.IMPLEMENT method

4.MONITOR method

5.ADJUST as required

6.CLOSE out

Page 12: IPMA Presentation

24th IPMA World Congresswww.ipma2010.com

Conclusion

SixP is ...o not a methodology but a frameworko is does not guarantee but ensures successo is best implement by an independant PM

consultanto ensures that lean process are designed,

developed, customised and maintained throughout the project life cycle

o it provides an additional layer of governance for the project manager and client