35
Producing and Exploring August 2011

Final teranga-investor-presentation-august-2011-081620111

Embed Size (px)

Citation preview

Page 1: Final teranga-investor-presentation-august-2011-081620111

Producing and Exploring

August 2011

Page 2: Final teranga-investor-presentation-august-2011-081620111

2

Cautionary Statement

This presentation contains forward looking information, within the meaning of applicable Canadian securities legislation, and forward looking

statements, within the meaning of applicable United States securities legislation, which reflects management’s expectations regarding

Teranga Gold Corporation’s (“Teranga” or the “Company”) future growth, results of operations (including, without limitation, future production

and capital expenditures), performance (both operational and financial) and business prospects (including the timing and development of

new deposits and the success of exploration activities) and opportunities. Wherever possible, words such as “plans”, “expects”, “does not

expect”, “budget”, “scheduled”, “estimates”, “forecasts”, “anticipate” or “does not anticipate”, “believe”, “intend” and similar expressions or

statements that certain actions, events or results “may”, “could”, “would”, “might” or “will” be taken, occur or be achieved, have been used to

identify such forward looking information. Although the forward looking information contained in this presentation reflect management’s

current beliefs based upon information currently available to management and based upon what management believes to be reasonable

assumptions, Teranga cannot be certain that actual results will be consistent with such forward looking information. A number of factors

could cause actual results, performance or achievements to differ materially from the results expressed or implied in the forward looking

information, including those listed in the “Risk Factors” section of the prospectus of Teranga, dated November 11, 2010 (the “Prospectus”).

These factors should be considered carefully and prospective investors should not place undue reliance on the forward looking information.

Forward looking information necessarily involves significant known and unknown risks, assumptions and uncertainties that may cause

Teranga’s actual results, performance, prospects and opportunities in future periods to differ materially from those expressed or implied by

such forward looking information. Although Teranga has attempted to identify important risks and factors that could cause actual actions,

events or results to differ materially from those described in the forward looking information, there may be other factors and risks that cause

actions, events or results not to be as anticipated, estimated or intended. There can be no assurance that the forward looking information

will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly,

prospective investors should not place undue reliance on such forward looking information. The forward looking information is stated as of

the date of the Prospectus and, except as required under applicable laws, Teranga assumes no obligation to update or revise such

information to reflect new events or circumstances.

Forward looking information and other information contained herein concerning mineral exploration and management’s general expectations

concerning the mineral exploration industry are based on estimates prepared by management using data from publicly available industry

sources as well as from market research and industry analysis and on assumptions based on data and knowledge of this industry which

management believes to be reasonable. However, this data is inherently imprecise, although generally indicative of relative market positions,

market shares and performance characteristics. While management is not aware of any misstatements regarding any industry data

presented herein, mineral exploration involves risks and uncertainties and industry data is subject to change based on various factors.

In addition, please note that statements relating to “reserves” or “resources” are deemed to be forward looking information as they involve

the implied assessment, based on certain estimates and assumptions, that the resources and reserves described can be profitably mined in

the future.

Page 3: Final teranga-investor-presentation-august-2011-081620111

3

Capitalization Summary

(1) As part of the demerger Mineral Deposits Ltd. retained 40 million TGZ shares and received C$50 million from the IPO proceeds.

(2) As at June 30, 2011

(3) Includes short-term investments and restricted cash

(4) US$23.6 MM drawn under the mining fleet finance lease facility with Societe Generale.

Ticker symbol: TGZ: TSX/ASX

Shares outstanding (1): 245.6 million

Stock options outstanding: 14.4 million

Share price (as at August 10, 2011): C$2.44

Market capitalization: C$599million

Cash position(2): US$65.9 million(3)

Debt position (2)(4): US$20.1 million

Net cash position (2): US$45.1 million

40 MM

20%

Focused on GROWTH

• Focused on Growing Reserves

• Focused on Growing Production

• Focused on Financial Strength

Page 4: Final teranga-investor-presentation-august-2011-081620111

4

Assets

Large exploration land package in Senegal, W.A.

• 1,488km2 virtually unexplored land surrounding operating mill

• An emerging world class gold district

Operating mine / mill

• Proven performance

• Only gold mining operation in the country

Strong balance sheet

• Able to self-fund exploration

Experienced management team

• Proven track record

Page 5: Final teranga-investor-presentation-august-2011-081620111

5

Sabodala Gold (Senegal)

• Sabodala is the only large scale gold mine in Senegal

• Senegal

– Mining Code passed in November 2003

– Successful democracy

– Stable political environment

– Estimated population of 13.7 million

– Mining friendly regime

– Government holds 10% free-carried interest in Sabodala and 3% royalty

– Tax-free holiday that ends May 2015

Page 6: Final teranga-investor-presentation-august-2011-081620111

6

Sabodala Gold Operations

• First gold pour in March 2009

– Approx. cost of $330M

• Mill expansion from 2 MM tpa to ~4 MM tpa underway

– Est. 140,000 oz Au production 2011 expanding to >200,000 oz Au

– Expected to be completed early 2012 at a cost of US$56 MM

• Well developed infrastructure

– Located 650 km east of the capital Dakar and 96 km north of the town Kedougou – paved road within 56 km of mine site

– 30 MW heavy fuel oil power plant located on site (36 MW with mill expansion)

Page 7: Final teranga-investor-presentation-august-2011-081620111

7

Highlights

Investor concerns during the IPO (Nov. 2010):

Short mine life

High cash costs

Hedge book

During the first half, the Company:

Increased reserves and provided reserve guidance

Increase production and lowered cash cost guidance for 2011 and 2012

Redesigned pit

Committed to take Gora from exploration into development

Ramped up exploration program

Expect consistent news flow

Expect more discoveries on the Regional Land Package

Accelerated delivery against hedge

Focused on adding reserves

Page 8: Final teranga-investor-presentation-august-2011-081620111

8

Growth Strategy

Focused on Growing Reserves - 1.5Moz currently to …

• Objective: 10-15+ year mine life

• Growth through exploration – aggressive exploration program on 1,455km2 Regional Land

Package of virtually unexplored prolific land

• Growth through regional opportunities – primary focus Senegal

Focused on Growing Production – 140,000oz current to …

• Leveraging off our existing mill – land package all truckable

• Doubling mill capacity – could increase further

Focused on Financial Strength – maintain strong balance sheet to self-fund exploration

• Eliminating hedge book – quickly but prudently

• Margin expansion (eliminate hedge and lower costs)

• Significant free cash flow to self-fund exploration strategy

• Manageable capex requirements

Page 9: Final teranga-investor-presentation-august-2011-081620111

9

Focused on Growing Production

Calendar Year 2011

•Est. production 140,000 oz at $750 - $775/oz

•CapEx $75M (primarily for mill expansion and capitalized Mine License exploration)

Calendar Year 2012

•Est. production 220,000 oz at $575-$625/oz

•CapEx ~ $25M (primarily for exploration) (1)

Post 2012 cash costs are expected to remain around the $600-650/oz level

0

50

100

150

200

250

300

350

400

450

500

2011 2012 2013 2014

Production Profile („000 ozs)

Production Exploration Success

• Assumes increased

production from regional

exploration success

(1) Excludes capital costs to develop regional deposits

Page 10: Final teranga-investor-presentation-august-2011-081620111

10

Focused on Financial Strength

Maintain strong balance sheet to self-fund exploration

• IPO recapitalization of balance sheet – net cash position US$45.1M(2)

• Eliminating hedge book – quickly but prudently – YE 2011~ 150,00oz at ~ $829/oz(3)

Book to be eliminated by mid 2013 if not sooner

• Margin expansion + increased production profile = significant free cash flow

• Manageable capex requirements

(1) Assumes $1500/oz gold price and cash cost of $600/oz

(2) As at June 30, 2011

(3) Non-Deferred Hedge Schedule Appendix page 34

• Assumes $1500/oz spot

gold price

• Rate of margin expansion

is a function of increasing

production through regional

exploration success

200

300

400

500

600

700

800

900

1,000

2011 2012 2013 2014

Cash

Marg

in (

$/o

z)

Cash Margin - expansion ($/oz)

Page 11: Final teranga-investor-presentation-august-2011-081620111

11

Focused on Growing Reserves

West Africa: Prolific, Under Explored Gold Belt

Page 12: Final teranga-investor-presentation-august-2011-081620111

12

0

300

600

900

1,200

1,500

1,800

2,100

Proven and

Probable

Measured and

Indicated

Inferred

Re

se

rve

/Re

so

urc

e (

00

0's

oz)

2,254

(@1.33 g/t)

774

(@1.06 g/t)

1,51

(@1.47 g/t)

(2)(3)

Gold Reserves and Resources(1)

(1) See Appendix page 33

(2) M+I resources are inclusive of reserves

(3) As at June 30, 2010, see Sabodala Technical Report

(3)

Focused on Growing Reserves

Kedougou-Kenieba Inlier – A Birimian Greenstone Belt

Page 13: Final teranga-investor-presentation-august-2011-081620111

13

Focused on Growing Reserves

Exploration Program (Calendar 2011)

1. Mine License Exploration:

$8 MM (~60,000m)

(YTD 30,000m)*

5 Drill Rigs

2. Regional Exploration:

$25 MM (~80-90,000)

( YTD 50,000m)*

12 Drill Rigs

TOTAL: + US$33 MM (140-150,000m)

(+180,000m RAB)

17 drill rigs

SS

C

* Majority of assays are pending – as at June 30, 2011

Page 14: Final teranga-investor-presentation-august-2011-081620111

14

1. Mine License Exploration 2. Regional Exploration

GORA

35 km radius

Budget: $8 M

33km2

Budget: $25M 1,455km2

Page 15: Final teranga-investor-presentation-august-2011-081620111

15

1. Sabodala Mine License Exploration

• US$8 MM exploration program is underway on the Sabodala Mine License

• 10 targets identified for follow up

• Potential to expand proven and probable reserves from 1.51 Moz gold to 2 to 3 Moz gold over the next

12 to 24 months increasing the mine life to ~ 10 to 15 years

Masato Extension:

• Continuation of Masato deposit

“The Corridor”:

• Continuation of the main Sabodala

structural trend to the north

Niakafiri, Niakafiri West &

Soukhoto:

• Down-dip extension of Niakafiri,

strike extension of Niakafiri West

and Soukhoto

Sambaya Hill:

• Confluence of Niakafiri Shear Zone

with Main Flat from Sabodala and

Masato Shear

Page 16: Final teranga-investor-presentation-august-2011-081620111

16

SABODALA STRUCTURAL TREND (“The Corridor”)

•Northerly trending extension of Sabodala pit

•Mineralization traced more than 200m north of the existing

pit along trend

•Open to north and west

•Drilling intersected wide widths of alteration similar to

Sabodala and Niakafiri

•Drilling 20m centres

•Plan is to conduct 10,800 metres of RC and Diamond

drilling to test target at depth and along strike

•Expect resources defined to be converted to reserves in

2011

Sabodala Mine License – “The Corridor”

Ayoub’s

Thrust

Mylonite

Shear Zone

Sabodala Pit

Page 17: Final teranga-investor-presentation-august-2011-081620111

17

Sabodala Mine License – Masato / Sambaya Hill Target

MASATO / SAMBAYA HILL

•Masato structural trend (1.6 Moz on Oromin JV) strikes

across onto our mine license

•Plan to conduct 5,000 metres of RC and Diamond drilling

to define structural trend and test structure at depth

•Initially being tested over a 500 metre strike length, 20 drill

holes totaling 6,150 metres of drilling

•First drill hole SMRC055

• 11m of 1.08 g/t from 234m down hole

• 20m of 3.53 g/t from 267m down hole

• Will be extended with core as part of

program

•Multiple mineralized zones have been identified with high

grade intervals apparent from aqua regia assays conducted

on site

•Expect to define new resources in calendar 2011

• Sambaya Hill - Trend defined by an IP and geochemical

anomaly

Sabodala Pit

Masato Extensions

Sambaya Hill

Masato Down Dip

Page 18: Final teranga-investor-presentation-august-2011-081620111

18

1. Mine License Exploration 2. Regional Exploration

GORA

35 KM radius

Budget: $8 M

33km2

Budget: $25M 1,455km2

Page 19: Final teranga-investor-presentation-august-2011-081620111

19

2. Regional Exploration

• From 2007 – 2009, no significant drilling was

done on the 1,455 km2 Regional Land Package

due to cash constraints

• There are 27 drill targets identified to drill by

end of year; drilling program (US$25M)

currently underway

• 50,000m of DD and RC and 98,000m of RAB

drilling completed June 30, 2011

• 10 drill rigs are currently on the Regional Land

Package (2 more rigs are expected in Sept.)

• All targets in trucking distance of the existing

mill

GORA

“The Donut”

Gora

Tourokhoto

35km radius

Toumboumba

Page 20: Final teranga-investor-presentation-august-2011-081620111

20

Gora – High-Grade Quartz Vein System

•Most advanced target: moving from exploration to development

•Inferred resource of 106,000 oz @ 6 g/t Au

•22 km from Sabodala mill

•800m strike length auriferous quartz vein, outcropping

•Deposit open in all directions

•4 active drill rigs (3 DD, 1 RC/DD)

•Induced polarization (“IP”) survey has been completed over the Gora

deposit and has identified gold anomalies along strike and parallel to

Gora – follow-up testing required

•Now understood to be a stacked vein system (vs. single-vein)

• Vein 1 extended (currently 8.8 g/t Au)

• Vein 2 now more continuous (3.0 g/t Au)

• Vein 3 now important mineralized body

• Vein 5 discovered just below Vein 1

•Excellent potential for bulk style mineralization

Page 21: Final teranga-investor-presentation-august-2011-081620111

21

Gora – High-Grade Quartz Vein System

1. Drilling completed to date – 144 RC and DD holes, 24,705m

• Current phase of 25,000m to be completed by August 2011, test to vertical depth of 130m

2. Step-out program commenced

• Minimum 2,400m DD

• 9 hole program expanded to 11, 8 holes completed and confirmed presence of mineralized structure in all 8

• True widths of up to 12 metres

• All assays pending but confirmed presence of mineralized structure

3. Exploration of immediate North and South – 6,200m program

• RC program, late July to Sept (depending on rig availability and performance)

4. Further 10,000m of RC, 5,000m DD

• Test strike extent of Gora mineralized trend and nearby parallel IP anomalies

• Commencement of program likely early October (depending on rig availability)

•Selected latest results include:

•Ongoing exploration, permitting, and feasibility

•Expect to bring resource to reserve by end of calendar 2011 with the goal of processing high-grade ore as soon as late 2012

June 13, 2011 - pre s s re le as e July 11, 2011 - pre s s re le as e Re ce nt re s ults

5m @ 33.7 g/t f rom 111m (V ein 1) 2m @ 20.6 g/t f rom 88m 1m @ 9.5 g/t f rom 23m

2m @ 61.3 g/t f rom 126 m (V ein 1) 2m @ 27.3 g/t f rom 108m 1m @ 3.6 g/t f rom 79m

3m @ 26.7 g/t f rom 154 m (V ein 1) 2m @ 20.7 g/t f rom 79m 1m @ 5.8 g/t f rom 28m

3m @ 47.7 g/t f rom 164 m (V ein 5) 4m @ 23.2 g/t f rom 132m

1m @ 33.0 g/t f rom 156m (V ein 4) 3m @ 24.1 g/t f rom 155m

4m @ 10.7 g/t f rom 145m (V ein 2) 4m @ 34.1 g/t f rom 155m

1m @ 51.8 g/t f rom 112m (V ein 2

9m @ 3.2 g/t f rom 87m (V ein 1)

Page 22: Final teranga-investor-presentation-august-2011-081620111

22

Toumboumba – Newest Target

•Latest discovery, potential to become second regional

deposit through the mill

•Located 10 km NW from Sabodala mill

•Alteration hosted mostly in granite (laterite cover)

•RAB drilling program commenced in April

•Expanded to encompass entire structural domain

•To date, 1,113 holes, 47,584m on a 100 x 50m grid

•Significant widths of ore mineralization were encountered

in western portion of anomaly, RAB holes grading >0.5 g/t

•Targets identified by RAB program are the subject of the

current RC program

•To date, 47 RC holes, 8,748m completed

•Continues to return wide auriferous zones

•Oxide mineralization of up to 50m in depth

•At minimum, potential for heap leaching

•Production could be fast tracked without displacing

material from Sabodala mill

•Deeper drilled required

Page 23: Final teranga-investor-presentation-august-2011-081620111

23

Toumboumba – Newest Target

June 13, 2011 - pre s s re le as e July 11, 2011 - pre s s re le as e Re ce nt re s ults

-e ar ly RAB re s ults -RAB re s ults -RAB re s ults

3m @ 6.13 g/t, inc luding 1m @ 15.44 g/t 2m @ 6.65 g/t f rom 16m 4m @ 3.31 g/t f rom 26m

3m @ 11.99 g/t, inc luding 1m @ 25.2 g/t 4m @ 6.06 g/t f rom 8m 2m @ 2.79 g/t f rom 20m

6m @ 18.85 g/t, inc luding 4m @ 27.7 g/t 2m @ 32.87 g/t f rom 38m

2m @ 3.57 g/t f rom 12m

3m @ 6.34 g/t f rom 30m

June 13, 2011 - pre ss re le as e July 11, 2011 - pre s s re le ase

-ear ly RC re s ults -RC re s ults

10m @ 2.35 g/t, inc luding 2m @ 9.69 g/t 6m @ 1.91 g/t f rom 17m including 1m @ 8.07 g/t

8m @ 5.45 g/t, inc luding 2m @ 17.75 g/t 3m @ 17.15 g/t f rom 39m including 1m @ 50 g/t

6m @ 2.68 g/t f rom 56m including 1m @ 8.79 g/t

3m @ 11.85 g/t f rom 36m including 1m @ 30.5 g/t

Re ce nt re s ults

-RC re s ults - Aqua Re gia

[email protected]/t f rom 37m including [email protected]/t and [email protected]/t f rom 52m inc luding [email protected]/t f rom SNWRC016

[email protected]/t f rom 125m f rom SNWRC017

[email protected]/t f rom 21m  f rom SNWRC023

[email protected]/t f rom 52m  f rom SNWRC027

[email protected]/t f rom 180m  f rom SNWRC029

Page 24: Final teranga-investor-presentation-august-2011-081620111

24

Toumboumba – Newest Target

Page 25: Final teranga-investor-presentation-august-2011-081620111

25

Diegoun North – “THE DONUT”

HONEY

JAM

CINNAMON

•7km x 4 Km complex of gold anomalism

•Contrasting rock types, porphyries, granites, dolerite & sediments

•Rock samples to 80 g/t Au

•RAB drilling has defined gold mineralization in bedrock

HONEY

JAM

•19,000m RAB drill program completed at Cinnamon, 663 holes

•143 holes returned auriferous intersections above 0.5 g/t

•First pass RC program at Jam and Honey; 51 holes completed for just

under 8,800m (40 holes anomalous levels of gold > 0.5 g/t)

•Recognition of a well-developed, auriferous north-east trending structure

Sabodala Ore Body

Page 26: Final teranga-investor-presentation-august-2011-081620111

26

Tourokhoto

•>5Km long, up to 1Km wide gold anomaly defined by termite sampling

•Parallels NE trending shears of the MTZ

•3 Moz Massawa deposit hosted on MTZ about 25Km south

•>240 ppb Au contours coincide with areas where MTZ shears are

intersected by later NE fault structures

•Rock sampling returned up to 10 g/t Au from sparse outcrop

•Wide zones of sheared sediments and quartz-feldspar porphyries

observed

•Quartz tourmaline veining observed

•23,416m RAB drill program completed with a total 1,006 holes

•Identified eight coherent zones of gold anomalism

•Early scout DD completed in Q1 identified significant structural zones

which host auriferous alteration zones

•Targets up to 700m in strike length

•Follow up geophysical, RC and DD testing required

Page 27: Final teranga-investor-presentation-august-2011-081620111

27

Goundamekho - Extensive Surface Gold Workings on Structures

Gold from Trenches

75g nugget from artisan workings

• 35 RC holes for 4,200m completed

• Multiple gold bearing structures warrant follow-up drilling

Page 28: Final teranga-investor-presentation-august-2011-081620111

28

Exploration Team / On Site Assay Lab

Geochem Sampling Team at Makana

Mapping at Makana

RC Drilling at Bransan

Niang, Database and GIS

Management

Structural Mapping

Field Work Sounkounkou On site assay lab

Mapping Trenches at Dembala Berola Part of team at Exploration Office

Page 29: Final teranga-investor-presentation-august-2011-081620111

29

Kedougou-Kenieba Inlier – A Birimian Greenstone Belt

An emerging world class gold district.

Focused on GROWTH

Page 30: Final teranga-investor-presentation-august-2011-081620111

30

1. Experienced Management Team

2. Senegal West Africa – 1,488km2 land position

• Largest land position in Senegal

3. Operating mine and mill – only mill in Senegal

4. Mill expansion underway

• from 2Mtpa to ~4Mtpa - increasing gold production profile

5. Aggressive exploration program

• US$33M to be spent in calendar 2011

• ~17 drill rigs

6. Strong Balance sheet – increasing free cash flow – with margin expansion

World-class asset in its early stages

Summary - Focused on GROWTH

Page 31: Final teranga-investor-presentation-august-2011-081620111

Producing and Exploring

August 2011

Page 32: Final teranga-investor-presentation-august-2011-081620111

Appendices

Competent Persons Statement The scientific and technical information contained in this release relating to exploration activities within the mining license is based on

information compiled by Mr. Bruce Van Brunt, who is a Fellow with The Australasian Institute of Mining and Metallurgy and is also a registered

professional geologist in the State of Washington, USA. He is qualified as a Competent Person as defined in the 2004 Edition of the

“Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and as defined in NI43-101. Mr. Van Brunt

has consented to the inclusion of this information in the form and context in which it appears in this release. Mr. Van Brunt is a full-time

employee of Teranga and not independent of Teranga within the meaning of NI43-101.

The scientific and technical information contained in this release relating to the regional exploration is based on information compiled by Mr.

Martin Pawlitschek, who is a member of the Australian Institute of Geoscientists. Mr. Pawlitschek is qualified as a Competent Person as

defined in the 2004 Edition of the “Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves” and as a

Qualified Person as defined in NI43-101. Mr. Pawlitschek has consented to the inclusion of this information in the form and context in which it

appears in this release. Pawlitschek is a full-time employee of Teranga and not independent of Teranga within the meaning of NI43-101.

The latest grade estimates as presented have been classified as a combination of Measured, Indicated and Inferred Mineral Resources in

accordance with CIM Definitions (2005) resource reporting classification guidelines and reconciled to the JORC Code (2004).

Mssrs. Van Brunt and Pawlitschek have reviewed and verified the data contained in this press release, including sampling, analytical and test

data underlying the estimates provided. Verification of the data included numerous site visits, database validation of historical drill results and

review of sampling and assaying protocols.

Page 33: Final teranga-investor-presentation-august-2011-081620111

33

Sabodala Gold Project: Reserves & Resources

(1) See the Sabodala Technical Report ; #’s as at June 30, 2010

Ore Grade Contained Gold

(000 tonnes) (g/t Au) (000 oz Au)

Proven & Probable

Sabodala 24,350 1.57 1,231

Niakafiri 7,623 1.15 281

Total 31,973 1.47 1,512

Measured & Indicated

Sabodala 41,892 1.39 1,869

Niakafiri 10,741 1.12 386

Total 52,633 1.33 2,254(1)

Inferred Resources

Sabodala 7,310 1.22 287

Niakifiri 7,248 0.88 205

Niakifiri West 7,144 0.82 188

Soukhoto 566 1.32 24

Gora 387 5.60 70

Total 22,655 1.06 774(1)

Page 34: Final teranga-investor-presentation-august-2011-081620111

34

Non-Deferred Hedge Schedule

Delivery Date Price US$/oz Ounces

17-Aug-2011 846.00 5,500

17-Nov-2011 846.00 18,500

17-Feb-2012 846.00 28,000

17-May-2012 846.00 28,000

15-Aug-2012 846.00 27,500

21-Nov-2012 832.92 25,000

20-Feb-2013 832.92 25,000

17-May-2013 790.66 25,000

21-Aug-2013 791.50 16,000

Total 198,500

Note: See page 40 of the Prospectus

Page 35: Final teranga-investor-presentation-august-2011-081620111

35

Management & Board

Alan R. Hill

Executive Chairman & CEO

• Mining engineer with over 20 years experience globally in project evaluations, acquisitions and mine

development as Executive VP of Barrick Gold

• Currently a Director of Gold Fields

• Former President and CEO of Gabriel Resources (2005 – 2009) and non-Executive Chairman of

Alamos Gold (2004 – 2007)

Richard S. Young

President & CFO

• Over 10 years experience in mining finance, development, corporate development, and investor

relations with Barrick Gold

• Former VP and CFO of Gabriel Resources (2005 – 2010)

Christopher R. Lattanzi

Director

• Mining engineer with over 20 years experience in property valuation, scoping, feasibility studies and

project monitoring on a global basis

• Currently a Director of Argonaut Gold and Spanish Mountain Gold

• Founding member and former president of Micon International (1988 – 2005)

Oliver Lennox-King

Director

• Over 30 years experience in the mineral resource industry with a wide range of experience in financing,

research and marketing

• Non-Executive Chairman of Fronteer Gold and director of CGX Energy

• Instrumental in the formation of Southern Cross Resources (1997), former President of Tiomin

Resources (1992 – 1997)

• MDL Director not standing for re-election

Alan R. Thomas

Director

• Director/Trustee and CFO of Labrador Iron Ore Royalty

• Former Director of Gabriel Resources (2006 – 2010), CFO of ShawCor (2000 – 2006), and CFO of

Noranda (1987 – 1998)

Frank Wheatley

Director

• Over 25 years experience as a director and senior officer of, and legal counsel to, a number of Canadian

public mining companies and has extensive legal and business experience in the mineral industry,

particularly in the areas of public financing, project debt financing, permitting of large scale mining

projects, and strategic mergers and acquisitions in the international minerals industry

• Currently the Executive Director, Corporate Affairs and Strategy of Talison Lithium Limited

• Currently a director of Lithic Resources Ltd. and Portal Resources Ltd.

• Former Vice-President and General Counsel of Gabriel Resources Ltd. (2000 - 2009)

• Former Vice President, Legal Affairs of Eldorado Gold Corporation