8
Energy costs and demand are on the rise, Pepco Energy Solutions is here to lend a helping hand. Through the installation of our technologies we can produce savings that average from 10%-20% off of your energy bills reducing your facilities operating costs. Pepco Solutions is not a power management firm, we utilize passive technologies that reduce the kWh consumption of our clients facilities while their electrical loads are in operation. www.pepcosolutions.com Industrial and Commercial Facilites We specilize in reducing the energy consumption of

(B) pepco energy solutions overview document email

Embed Size (px)

DESCRIPTION

The Pepco Solutions Company Overview Document.

Citation preview

Page 1: (B) pepco energy solutions overview document email

Energy costs and demand are on the rise, Pepco Energy Solutions is here to lend a helping hand.Through the installation of our technologies we can produce savings that average from 10%-20% off

of your energy bills reducing your facilities operating costs.

Pepco Solutions is not a power management firm, we utilize passive technologies that reduce the kWh consumption of our clients facilities while their electrical loads are in operation.

www.pepcosolutions.com

Industrial and Commercial FacilitesWe specilize in reducing the energy consumption of

Page 2: (B) pepco energy solutions overview document email

Pepco SolutionsWe are here to dramatically reduce your facilities operating and maintenance costs.

We save you money!

Utilizing proven technologies, Pepco Solutions is able to reduce your facilities electrical bills by an average of 10%-20%!

We design and install custom energy conservation systems proven to:

• Reduce electrical energy consumption • Decrease greenhouse gas emissions • Improve power quality, power factor and voltage • Increase electrical system capacity • Reduce unnecessary heat • Improve cooling capacity of air conditioning and refrigeration • Lengthen lives of motors, lights, air conditioning and refrigeration

Our savings percentages are backed by a third party insurance company! After Pepco solutions has had the opportunity to move forward with an Energy Study and Project Engineering on your facility, we will establish a base minimum guaranteed savings percentage; this savings percentage is then backed by a third party insurance company, which is currently The Lloyds of London Insurance Co.

Page 2

Page 3: (B) pepco energy solutions overview document email

Pepco Solutions Leadership

Jim has worked as a project manager in construction and land development for 18 years with experience working with engineers, contractors and governing agencies to improve infrastructure in Central Ohio. With present day challenges for companies to operate at the highest level of efficiency, Jim has teamed up with Energy Automation Systems, Inc. with the vision of helping businesses reduce operating costs and improve their overall profitability through electrical efficiency.

President: Jim Pepin

Jim’s main focus as President is Field Operations. With the industry skills, that he brings to the table, Jim is able to quickly identify cost effective solutions for our clients not only from a field and installation standpoint, but from a product knowledge standpoint as well.

Background:

Executive Vice President: Scott Graham, CSI

Scott is responsible for business development, sales, marketing as well as sales force development. His background in the industrial and commercial construction industry coupled with his sales and teaching experience enables him to reach out to organizations that can benefit from Pepco Solutions assistance.

Scott has been employed in architecture, engineering and construction for over ten years. He spent four of the ten years building commercial and industrial facilities nationally and most recently managing the electrical construction in power generation facilities nation-wide. He recently resigned from teaching construction management at a college local to Columbus, Ohio and served on The Board of Directors for The Construction Specifications Institute of Columbus Ohio. Scott is determined and anxious to educate companies on how Pepco Solutions can reduce their operating costs through the installation of our energy saving technologies.

Background

Page 3

Page 4: (B) pepco energy solutions overview document email

Reduce Maintenance Costs / Increase the Life of Your Equipment

Tepro Molding Plant (Tennessee)

Minimum Guaranteed savings at 11.29%

Actual Savings averages 33.7%

Cost of installation recouped in 8 months.

Pepsi Cola Bottling Plant (Maryland)

Minimum Guaranteed savings at 13.46%

Actual Savings averages 14.65%

Tempur-Pedic (Virginia)

Minimum Guaranteed savings at 15.2%

Actual Savings averages 20.6%

Also eliminated motor failure through improved power quality.

British Aerospace (Tennessee)

Minimum Guaranteed savings at 13.60%

Actual Savings averages 15.2%

Installed 12,800 pieces of equipment in a 5000 acre facility.

Industrial equipment, motors, lighting, and many other electrical devices rely on electricity to operate; however poor electric quality can be damaging to these types of equipment as well. Through the installation of our systems we are able to reduce the maintenance on and prolong the life of your electrical equipment, motors, lighting and much more.

Previous EASI System Installation Results

Page 4

Page 5: (B) pepco energy solutions overview document email

PowerLinerEASI’s PowerLiner meets the need to reduce energy costs associated with nonlinear electrical equipment. By canceling a portion of the harmonic current normally drawn by such loads, the PowerLiner reduces kilowatt-hour consumption and can alleviate many problems associated with harmful harmonics.

EasilinerMotorized pieces of equipment are historically inefficient users of electricity. Unnecessarily high electrical bills and maintenance costs result from the conversion of the reactive current. The EasiLiner provides the benefits of reactive power correction while virtually eliminating the risks associated with traditional correction methods. Increased motor functionality means lower energy costs from reduced current draw.

MultilinerThe MultiLiner is EASI’s product solution for gaining cost-effective savings on groups of loads unpredictably used, or that switch on and off in irregular patterns.This energy cost-saving solution requires no user adjustment and lowers energy costs by extending the life of motors and equipment, improving facility volt-age and increasing electrical capacity.

EuroLinerThe EuroLiner provides predictable lighting cost savings with either electronic ballast fluorescent or HID lighting. Designed for use on circuits where measured load amperage is less than 20 amperes at any voltage from 100V to 347V, the EuroLiner modernizes your lighting equipment and air conditioning by lessening the heat load added by your lights.

LVREASI’s Lighting Voltage Regulator (LVR) reduces the energy used in industrial lighting systems, allowing them to run cooler and longer with small reduction of lighting levels. It provides you with an energy cost savings ofbetween 15 and 30%. Compatible with most modern magnetic ballasts found in fluorescent, high intensity, and all types of incandescent lighting fixtures, the LVR can control many types of lighting products without changing internal jumpers or switch settings.

IllumiLinerThe IllumiLiner units are entirely solid-state with microprocessors that continually monitor and modify the AC sine wave. The IllumiLiner controls entire lighting circuits from the lighting panel, providing circuit-by-circuit flexibility and generally a high return on investment. The ventilated cabinet is made of sturdy, heavy gauge metal with a mar-resistant, epoxy finish to withstand industrial environments. The IllumiLiner improves the lighting performance and provides for control-lable illumination distribution.

Located below are just a few of the state of the art technologies manufactured bin Nashville Tennessee that we at Pepco Solutions may suggest to install in your facility to reduce kilowatt hour consumption.

Pepco Solution’s state of the art money and energy saving technologies

Page 5

Page 6: (B) pepco energy solutions overview document email

THE PEPCO SOLUTIONS PROCESSFROM FIRST CONTACT TO PROJECT COMPLETION

In this initial step Pepco Solutions introduces you to our technologies, we like to discuss your facilities power usage and average monthly energy costs. One or more of our well qualified representatives will be present during this visit to educate you on how our power saving systems operate.

Step 1: Initial Technology Demonstration and Presentation

Pepco Solutions hand delivers an energy study proposal to you and explains our planned approach at saving your facility money and energy.

In a written statement we will tell you:• A minimum guaranteed power cost savings.• The charges for performing the energy study and project design.• Your estimated return on investment.

(Note: The cost of the Energy Study will be credited towards the cost of installation.)

Step 3: Energy Study Proposal

This step enables Pepco Solutions to learn more about your facilities unique needs, Pepco Solutions will conduct a walkthrough of your facility with the person who best understands its electrical system. During the walkthrough, our representative gathers information about:

• Electrical system • Equipment operations • Electrical billing issues and history • Power quality challenges • Electrical maintenance challenges

Step 2: Facility Walkthrough

(Note: Pepco Solutions will need 12 months electrical billing history in-order to proceed to Step 3)

The energy study step involves the documentation of each and every electrical load in your facility, a team of experienced electricians along with a Pepco Solutions Site Superintendent will be present on-site to retrieve this information from your facilities electrical devices. As soon as Pepco Solutions has completed gathering all of the data we are in need of, Pepco Solutions immediately begins the project design/engineering phase. The size and number of your facilities dictate the amount of time we spend on this step.

Step 4: Energy Study

Page 6

Page 7: (B) pepco energy solutions overview document email

Engineering is complete, we now have a minimum guaranteed savings and rate of return on your investment established due to our energy study and project design/engineering. Your Pepco Solutions representative returns to you with a well planned out construction time line, scope of work and proposal. The information included also emcompases a detailed list of technology to be installed in your facility and information regarding the positive environmental impact this project will have.

(Note: Please feel free to ask for a sample installation proposal.)

Step 5: Installation Proposal

We execute our carefully designed installation plan for electrical system improvements and adjustments that are specifically engineered for the power conservation needs of your facility(s):

• The addition and installation of power conservation technologies to the electric devices/motors targeted from our in-depth energy study.

• A precise round of maintenance and upgrade work to your lighting systems that may include retrofitting, harmonics correction, or ballast or even whole fixture replacement.

Step 6: Equipment Installation

”Before” and “after” data will be captured as the system is being installed. A Pepco Solutions representative follows up regularly to verify the savings and make sure you are satisfied with the results. We measure and verify a system’s performance using methods in compliance with the International Performance Measurement and Verification Protocol (IPMVP).

(Note: The IPMVP was established by a network of energy professional and organizations from more than 25 countries to standardize the methods by which energy conservation projects are measured and verified.)

Step 7: Measurement and Verification

Secondary Installation Benefits:• Elimination of power factor penalties• Lower KVA or KVAR penalties• Improved voltage• Increased capacity of electrical system: 5%-15%, in some cases 20%• Cooler panels, wiring and circuit breakers• Increased power factor (efficiency of your electricity)• Reduced fire and arc flash hazard• Power conditioning (Reduced harmonics, fluctuations and other interference on your power lines)• More cooling capacity from A/C.• More cooling capacity from refrigeration.• Less heat to be removed by A/C.• Reduced downtime on equipment & production.• Lower labor cost because of reduced maintenance.

Page 7

Page 8: (B) pepco energy solutions overview document email

Pepco Solutions, LLC.10898 Snyder Church Road

Baltimore, Ohio 43105Phone: (614) 593-2868

Fax (614) 416-0550www.pepcosolutions.com

© Pepco Solutions, LLC. 2009-2010