Upload
tric-tools
View
557
Download
1
Embed Size (px)
Citation preview
2004-0520TX
technical archives
www.trictrenchless.com
TRIC Training Log: 05-20-04
Client: ARS Rescue Rooter, Fort Worth, TX
Job: Residence, rear easement, replacing 4” VCP
Pull: 65’ / 4” / SDR17
2004-0520TX
technical archives
www.trictrenchless.com
We at TRIC Tools have specific requirements for the use and maintenance of our equipment with regard to safety and efficiency on the job. Our written and verbal recommendations coincide with safety regulations set by local, state, and national government agencies. Our
clients may have standards over and above industry regulations. However, the safety equipment, apparel, and operating procedures
demonstrated by our clients in this presentation may or may not comply with above mentioned government regulations.
2004-0520TX
technical archives
www.trictrenchless.com
Facing the pipe ends: Watch for full, even ribbons of shaved material from both mating surfaces. Start blades moving before drawing ends together and keep them spinning as you separate them. Support opposite ends of pipe to help line up ends in fusing machine.
2004-0520TX
technical archives
www.trictrenchless.com
Heating the pipe: Make firm, even contact with heating iron, then use neutral pressure. Fusing time and temperatures are also affected by weather.
2004-0520TX
technical archives
www.trictrenchless.com
Joining pipe: It is helpful, though not necessary,to have another person to remove the heating iron so the fuser can concentrate on the joint at the moment of connection.
2004-0520TX
technical archives
www.trictrenchless.com
Fusing: As the heated pipe ends join, watch the “roll” of hot material as the weld forms two even, opposing rounded beads at the point of connection. Set jig at that point and let pipe set as
per manufacturer’s specifications.
2004-0520TX
technical archives
www.trictrenchless.com
Good welds.
2004-0520TX
technical archives
www.trictrenchless.com
Pipe fusing convention.
2004-0520TX
technical archives
www.trictrenchless.com
Cooling: Weld times vary according to ambient temperature and humidity, pipe size, and wall thickness. Refer to manufacturer’s specifications. A good rule of thumb is to wait until weld is only
slightly warm when grasped tightly.
2004-0520TX
technical archives
www.trictrenchless.com
Preparing the pulling end: Cut a shear wall straight down and wide enough for the pressure plate, eliminating any protruding pipe. Cut down about 6” below pipe at base of
pressure plate wall.
2004-0520TX
technical archives
www.trictrenchless.com
Cribbing the pulling wall.
2004-0520TX
technical archives
www.trictrenchless.com
Lubricating the ram jaws: Use a liberal amount of anti-seize in upper and lower jaw tracks, wherever jaws slide inside their housing on the ram. This is very important.
2004-0520TX
technical archives
www.trictrenchless.com
Ready for power: Here metal fencing is used to keep the ram and pulley upright until the power unit can be connected and tension applied.
2004-0520TX
technical archives
www.trictrenchless.com
All hands on deck: Moving the fused pipe. Keep in mind which end is more convenient to attach the bursting head with regard to eventual point of entry.
2004-0520TX
technical archives
www.trictrenchless.com
Getting in position: Feeding the tail end of the pipe out beyond the property line to position head at entry hole. Flexibility of PE pipe is advantageous both above and below ground!
2004-0520TX
technical archives
www.trictrenchless.com
Connection: Attaching the cable to the bursting head.
2004-0520TX
technical archives
www.trictrenchless.com
Ready to pull: Securing the clevis bolt with the cotter pin.
2004-0520TX
technical archives
www.trictrenchless.com
Entry: Keep an eye on the cable, head, and pipe as pull begins, to assure as smooth, direct, and unrestricted a start as possible.
2004-0520TX
technical archives
www.trictrenchless.com
The pull: Pipe moves quickly with a heavy duty power unit.
2004-0520TX
technical archives
www.trictrenchless.com
Safety first: Stay out of the pulling hole when the job is in progress.
2004-0520TX
technical archives
www.trictrenchless.com
Cable storage: An old tire is an ideal container for the cable.
2004-0520TX
technical archives
www.trictrenchless.com
End of the line: Slow down and watch carefully for the clevis sheath to appear.
2004-0520TX
technical archives
www.trictrenchless.com
Using the extender cage: Wood cribbing is particularly useful at this point, since the resistance plate is removed for the cage to be used.
2004-0520TX
technical archives
www.trictrenchless.com
Arrival: Keep debris away from head and cable to allow clear vision of the clevis sheath at all times. Never allow the clevis sheath to be drawn into the pulley assembly.
2004-0520TX
technical archives
www.trictrenchless.com
Releasing the cable.
2004-0520TX
technical archives
www.trictrenchless.com
Ready to disconnect the cable.
2004-0520TX
technical archives
www.trictrenchless.com
Removing the cotter pin from the clevis bolt: Keep a good supply of cotter pins on hand, as they should only be used once.
2004-0520TX
technical archives
www.trictrenchless.com
Setting up the top end.
2004-0520TX
technical archives
www.trictrenchless.com
Bottom end: Leave enough pipe at the point of entry to “bump” towards the pulling end with a sledge hammer. This helps relieve any pipe stretching that may have occurred during the pull,
and also assists in coupling connections.
2004-0520TX
technical archives
www.trictrenchless.com
Bumping: With the smaller pipe diameters, this is a very useful technique. Here the full length of pipe is being tapped upstream to meet the house cleanout.
2004-0520TX
technical archives
www.trictrenchless.com
Perfect union: When possible, bumping eliminates the need for extra couplings.
2004-0520TX
technical archives
www.trictrenchless.com
Property line connection.
2004-0520TX
technical archives
www.trictrenchless.com
Water test: PE pipe used for trenchless sewer replacement is also used for high pressure gas and water, thus it is extremely reliable.
2004-0520TX
technical archives
www.trictrenchless.com
Releasing test water at bottom end.
2004-0520TX
technical archives
www.trictrenchless.com
Cleanup: A pressure washer is highly recommended.
2004-0520TX
technical archives
www.trictrenchless.com
Maintenance: Thoroughly remove all debris from pulling equipment after each job.
2004-0520TX
technical archives
www.trictrenchless.com
Ram etiquette: Removing the jaws is the easiest way to clean them.
2004-0520TX
technical archives
www.trictrenchless.com
Disassembly: Top jaw retainer plates must be removed to release jaws completely. Bottom set can be slipped out when ram is raised.
2004-0520TX
technical archives
www.trictrenchless.com
After cleanup: Displace wash water with WD-40. Jaws can be kept apart in a clean container until next job.
2004-0520TX
technical archives
www.trictrenchless.com
Spray away: Pressure washing is harmless to pulling equipment.Goggles are recommended, however.
2004-0520TX
technical archives
www.trictrenchless.com
Power unit: Treat hoses and hose connections with care.