28
Tabel 2-11 Biaya Langsung Personil (Remuneration/Billing Rate) Tahun 2011 Untuk Tenaga Ahli Nasional berpendidikan S1/S2/S3 dengan Undangan Nasional (NCB) Berdasarkan Pengalaman Profesi yang setara (Comparable experiences PROVINSI DKI JAKARTA indeks = 1.000 KELOMPOK AHLI KUALIFIKASI GOLONGAN S1 I-A 1 **) I-B 2 **) I-C 3 13,350,000 I-D 4 14,850,000 II-A 5 16,350,000 1 II-B 6 17,850,000 2 II-C 7 19,350,000 3 II-D 8 20,850,000 4 III-A 9 22,350,000 5 III-B 10 23,850,000 6 III-C 11 25,350,000 7 III-D 12 26,850,000 8 IV-A 13 28,350,000 9 IV-B 14 29,850,000 10 IV-C 15 31,350,000 11 IV-D 16 32,850,000 12 V-A 17 34,350,000 13 V-B 18 35,850,000 14 V-C 19 37,350,000 15 V-D 20 38,850,000 16 VI-A 21 40,350,000 17 VI-B 22 41,850,000 18 VI-C 23 43,350,000 19 VI-D 24 44,850,000 20 VI-E 25 46,350,000 21 *) **) S1 pengalaman 1-2 tahun dianggap Sub Profesional (lihat Tabel 3-11 Biaya Langsung Personil untuk provinsi lain (diluar DKI Jakarta) dika TAHUN PENGALAMAN RUPIAH PER-BULAN TAHUN PENGALAMAN AHLI PRATAMA AHLI MUDA AHLI MADYA AHLI UTAMA AHLI KEPALA AHLI PEMBINA KEPALA Referensi Biaya Minimal Tahun 2011 (benchmarking DKI Jakarta dengan

billing rate

Embed Size (px)

DESCRIPTION

perhitungan tenaga ahli

Citation preview

Page 1: billing rate

Tabel 2-11

Biaya Langsung Personil (Remuneration/Billing Rate) Tahun 2011Untuk Tenaga Ahli Nasional berpendidikan S1/S2/S3dengan Undangan Nasional (NCB)Berdasarkan Pengalaman Profesi yang setara (Comparable experiences)

PROVINSI DKI JAKARTAindeks = 1.000

KELOMPOK AHLI

KUALIFIKASI GOLONGAN S1 S2 I-A 1 **) I-B 2 **) I-C 3 13,350,000 I-D 4 14,850,000 II-A 5 16,350,000 1 17,100,000 II-B 6 17,850,000 2 18,900,000 II-C 7 19,350,000 3 20,850,000 II-D 8 20,850,000 4 22,650,000 III-A 9 22,350,000 5 24,450,000 III-B 10 23,850,000 6 26,250,000 III-C 11 25,350,000 7 28,050,000 III-D 12 26,850,000 8 29,850,000 IV-A 13 28,350,000 9 31,800,000 IV-B 14 29,850,000 10 33,600,000 IV-C 15 31,350,000 11 35,400,000 IV-D 16 32,850,000 12 37,200,000 V-A 17 34,350,000 13 39,000,000 V-B 18 35,850,000 14 40,950,000 V-C 19 37,350,000 15 42,750,000 V-D 20 38,850,000 16 44,550,000 VI-A 21 40,350,000 17 46,350,000 VI-B 22 41,850,000 18 48,150,000 VI-C 23 43,350,000 19 49,950,000 VI-D 24 44,850,000 20 51,900,000 VI-E 25 46,350,000 21 53,700,000

*)**) S1 pengalaman 1-2 tahun dianggap Sub Profesional (lihat Tabel 3-11).

Biaya Langsung Personil untuk provinsi lain (diluar DKI Jakarta) dikalikan dengan Indeks Biaya Langsung

TAHUNPENGALAMAN

RUPIAH PER-BULAN TAHUN

PENGALAMAN

RUPIAH PER-BULAN

AHLI PRATAMA

AHLI MUDA

AHLI MADYA

AHLI UTAMA

AHLI KEPALA

AHLI PEMBINAKEPALA

Referensi Biaya Minimal Tahun 2011 (benchmarking DKI Jakarta dengan Indeks = 1.000).

Page 2: billing rate

Personil per provinsi (tabel 5-11)

Page 3: billing rate

S3

1 26,550,000 2 28,500,000 3 30,600,000 4 32,550,000 5 34,500,000 6 36,450,000 7 38,550,000 8 40,500,000 9 42,450,000

10 44,400,000 11 46,500,000 12 48,450,000 13 50,400,000 14 52,350,000 15 54,450,000 16 56,400,000 17 58,350,000

Biaya Langsung Personil untuk provinsi lain (diluar DKI Jakarta) dikalikan dengan Indeks Biaya Langsung

TAHUNPENGALAMAN

RUPIAH PER-BULAN

Page 4: billing rate

Tabel 3-11

Untuk Tenaga Sub Profesional *)

PROVINSI DKI JAKARTAindeks = 1.000

NO. PERSONIL

1. CAD/CAM OPERATORD3/S0 (5-10 Tahun)

7,200,000 S1 (0-3 Tahun)S2 (0-1 Tahun)

2.D3/S0 (>3 Tahun)

8,700,000 S1 (0-3 Tahun)S2 (0-1 Tahun)

3. HARDWARE/TECHNICIAND3/S0 (>3 Tahun)

7,200,000 S1 (0-3 Tahun)S2 (0-1 Tahun)

4. FACILITATORD3/S0 (>3 Tahun)

7,200,000 S1 (0-3 Tahun)S2 (0-1 Tahun)

5.D3/S0 (>6 Tahun)

9,500,000 S1 (3-5 Tahun)S2 (1-3 Tahun)

6. ASSISTANT PROFESSIONAL STAFFD3/S0 (3-6 Tahun)

9,000,000 S1 (0-3 Tahun)S2 (0-1 Tahun)

7. SPECIAL TECHNICIAN/INSPECTORD3/S0 (>3 Tahun)

8,700,000 S1 (0-3 Tahun)S2 (0-1 Tahun)

8. TECHNICIAND3/S0 (>3 Tahun)

7,200,000 S1 (0-3 Tahun)S2 (0-1 Tahun)

9. INSPECTORD3/S0 (>3 Tahun)

7,200,000 S1 (0-3 Tahun)S2 (0-1 Tahun)

10. SURVEYORD3/S0 (>3 Tahun)

6,700,000 S1 (0-3 Tahun)S2 (0-1 Tahun)

*)

Biaya Langsung Personil (Remuneration/Billing Rate) Tahun 2011

PENDIDIKAN & PENGALAMAN

RUPIAH PERBULAN

SOFTWARE PROGRAMMER/ IMPLEMENTER

SENIOR ASSISTANT PROFESSIONAL STAFF

Referensi Biaya Minimal Tahun 2011 (benchmarking DKI Jakarta dengan Indeks = 1.000).

Page 5: billing rate

Biaya Langsung Personil untuk provinsi lain (diluar DKI Jakarta) dikalikan dengan Indeks Biaya LangsungPersonil per provinsi (tabel 5-11)

Page 6: billing rate

Biaya Langsung Personil untuk provinsi lain (diluar DKI Jakarta) dikalikan dengan Indeks Biaya Langsung

Page 7: billing rate

Tabel 4-11

Untuk Tenaga Pendukung *)

PROVINSI DKI JAKARTAindeks = 1.000

NO. PERSONIL

1. OFFICE MANAGER 7,600,000 2. SITE OFFICE MANAGER/ADMINISTRATOR 6,900,000 3. BILINGUAL SECRETARY 7,500,000 4. SECRETARY 4,650,000 5. COMPUTER OPERATOR/TYPIST 4,100,000 6. DRAFTER (MANUAL) 3,450,000 7. MESSENGER 2,400,000 8. OFFICE BOY 1,750,000 9. DRIVER 2,600,000

10. OFFICE GUARD/SECURITY OFFICER 2,150,000

*)

Biaya Langsung Personil untuk provinsi lain (diluar DKI Jakarta) dikalikan dengan Indeks Biaya LangsungPersonil per provinsi (tabel 5-11)

Biaya Langsung Personil (Remuneration/Billing Rate) Tahun 2011

RUPIAH PERBULAN

Referensi Biaya Minimal Tahun 2011 (benchmarking DKI Jakarta dengan Indeks = 1.000).

Page 8: billing rate

Tabel 5-11

Indeks Biaya Langsung Personil per Provinsi Tahun 2011

NO. PERSONIL INDEKS1. Nanggroe Aceh Darussalam 1.242 2. Sumatera Utara 0.939 3. Sumatera Barat 0.878 4. Riau 0.983 5. Kepulauan Riau 0.976 6. Jambi 0.843 7. Sumatera Selatan 0.876 8. Kepulauan Bangka Belitung 0.862 9. Bengkulu 0.783

10. Lampung 0.764 11. Banten 0.882 12. 1.000 13. Jawa Barat 0.719 14. Jawa Tengah 0.698 15. DI Yogyakarta 0.743 16. Jawa Timur 0.681 17. Bali 0.797 18. Nusa Tenggara Barat 0.871 19. Nusa Tenggara Timur 0.828 20. Kalimantan Barat 0.744 21. Kalimantan Tengah 0.899 22. Kalimantan Selatan 0.935 23. Kalimantan Timur 0.917 24. Sulawesi Utara 0.979 25. Sulawesi Tengah 0.817 26. Sulawesi Tenggara 0.870 27. Sulawesi Selatan 0.942 28. Sulawesi Barat 0.908 29. Gorontalo 0.761 30. Maluku 0.881 31. Maluku Utara 0.895 32. Papua 1.332 33. Papua Barat 1.259

DKI Jakarta (Benchmarking)

Page 9: billing rate

Tabel 6A-11

NO JENIS PENGELUARAN SATUAN KETERANGAN

1. 4

4

4

� Untuk Lajang Org-Trip At Cost

� Untuk Keluarga Org-Trip At Cost

2. Tiket Penerbangan 4

4

4 Tidak termasuk Airport Tax.� Untuk Lajang PP At Cost � Airport Tax Org At Cost

� Untuk Keluarga PP At Cost �

� Airport Tax Org At Cost �

3. Kelebihan Bagasi Kg/Trip At Cost 4 Max. 10 Kg/Orang/Trip(Excess Baggage) 4 Hanya untuk Mobilisasi & Demobilisasi.

4. Bagasi yang Tidak Dibawa Sendiri

Biaya Langsung Non Personil (Direct Cost) Tahun 2011Untuk Jenis Pengeluaran Reimbursable

HARGA(Rp)

Dokumen Perjalanan ke Luar Negeri

Biaya untuk pengurusan Paspor, Visa, Fiskal, Sertifikat Kesehatan, dll.

Jumlah Trip Tenaga Ahli terdiri dari Mobilisasi, Perjalanan Dinas, Cuti Tahunan dan Demobilisasi.

Jumlah Trip Keluarga (Max. 1 Istri dan 2 Anak dibawah 18 Tahun) hanya Mobilisasi, Cuti Tahunan dan Demobilisasi.

Proyek ≥12 Bulan

Untuk Penerbangan Internasional, berlaku tarif IATA, kelas ekonomi.

Untuk Penerbangan Domestik, berlaku tarif kelas ekonomi.

Proyek ≥12 Bulan

Untuk 1 Istri, 2 Anak (belum kawin) dengan usia dibawah 18 tahun.

Untuk 1 Istri, 2 Anak (belum kawin) dengan usia dibawah 18 tahun.

Page 10: billing rate

� Untuk Lajang Kg-Trip At Cost � Max. 25 Kg/Orang/Trip� Untuk Keluarga Kg-Trip At Cost � Max. 40 Kg/Keluarga/Trip

NO JENIS PENGELUARAN SATUAN KETERANGAN

5. Biaya Perjalanan Darat(LOCAL/INLAND TRAVEL)

� Untuk Lajang Org-Trip At Cost

� Untuk Keluarga Kel-Trip At Cost

6. Biaya Pembelian 4 Spesifikasi ditetapkan proyekKebutuhan Proyek

Kendaraan :� Roda 4 Unit At Cost �

� Roda 2 Unit At Cost �

Peralatan Kantor :� Computer Desk Top Unit At Cost � Laptop Unit At Cost � Printer Laser Jet A-3 Unit At Cost � Printer Laser Jet A-4 Unit At Cost � Printer Color A-3 Unit At Cost � Printer Color A-4 Unit At Cost � Scanner Unit At Cost � Mesin Fotocopy Unit At Cost � Mesin Fax Unit At Cost � Mesin Ketik Unit At Cost � LCD Proyektor Unit At Cost � Digital Camera Unit At Cost � Plotter Unit At Cost � Software/Royalty Unit At Cost � Perlengkapan Khusus Unit At Cost � dll Unit At Cost

Proyek ≥12 Bulan

HARGA(Rp)

Proyek ≥12 Bulan

Termasuk biaya registrasi dan asuransi kendaraan.

Termasuk biaya registrasi dan asuransi kendaraan.

Page 11: billing rate

Furniture Kantor :� Meja dan Kursi Kerja Set At Cost � Meja dan Kursi Rapat Set At Cost � Air Conditioner Unit At Cost � Filing Cabinet Unit At Cost � White Board Unit At Cost � Shelf Unit At Cost � Water Dispenser Unit At Cost � dll Unit At Cost

7. Biaya Instalasi Telepon/Internet Unit At Cost

Catatan :Penentuan harga "At Cost" ini bisa mengikuti aturan yang ada pada Perpres No. 54 Tahun 2010 Pasal 66Angka (4), yaitu HPS disusun paling lama 28 hari kerja sebelum batas akhir pemasukan penawaran.

Tabel 6B-11

NO JENIS PENGELUARAN SATUAN KETERANGAN

1. Sewa Kendaraan dan O&M**) 4

4

� Roda-4 Bulan 8,500,000 � Tidak termasuk O&M, Driver� Roda-4 Hari 680,000 � Termasuk O&M� Roda-2 Bulan 1,450,000 � Tidak termasuk O&M� Roda-2 Hari 180,000 � Termasuk O&M� Kendaraan Air Hari ***) � Termasuk O&M

� O&M Roda-4 Bulan 3,900,000 � O&M Roda-2 Bulan 700,000

2. Sewa Kantor Proyek 4

4

Biaya Langsung Non Personil (Direct Cost) Tahun 2011Untuk Jenis Pengeluaran Fixed Unit Rate

HARGA(Rp)

Untuk lokasi proyek terpencil/terisolir di suatu provinsi, harga dapat 1.5 s/d 2.5 kali lebih besar

Tidak termasuk Driver untuk kendaraan Roda-4

Kebutuhan ruangan rata-rata 6 M² per orang, maksimum untuk 25 orang, dan ruang rapat ± 30 M²

Untuk proyek <6 Bulan, fasilitas Sewa Kantor diberikan jika lokasi pelaksanaan operasional pekerjaan/proyek berbeda provinsi/kota/kabupaten dengan Kantor Perusahaan

Page 12: billing rate

4

4

� Jakarta 185,000 � Provinsi 125,000 � Kabupaten 95,000 � Lapangan 85,000

3. Sewa Peralatan Kantor **)� Computer Desk Top Unit-Bulan 1,000,000 � Laptop Unit-Bulan 1,600,000 � Printer Laser Jet A-3 Unit-Bulan 1,100,000 � Printer Laser Jet A-4 Unit-Bulan 700,000 � Printer Color A-3 Unit-Bulan 800,000 � Printer Color A-4 Unit-Bulan 600,000 � Scanner A-3 Unit-Bulan 550,000 � Scanner A-4 Unit-Bulan 330,000 � Mesin Fotocopy Unit-Bulan 4,600,000 � Mesin Fax Unit-Bulan 330,000 � Mesin Ketik Unit-Bulan 330,000 � LCD Proyektor Unit-Bulan 550,000 � Digital Camera Unit-Bulan 380,000 � Plotter Unit-Bulan 4,000,000 � dll Unit-Bulan

4.� Meja dan Kursi Kerja Set-Bulan 1,250,000 � Meja dan Kursi Rapat Set-Bulan 1,750,000 � Air Conditioner Set-Bulan 420,000 � Filing Cabinet Set-Bulan 170,000 � White Board Set-Bulan 75,000 � Shelf Set-Bulan 75,000 � Water Dispenser Set-Bulan 75,000 � dll

5. Biaya Operasional Kantor Proyek 4

� Kantor Utama Proyek Bulan 11,500,000

Untuk proyek <6 Bulan, fasilitas Sewa Kantor diberikan jika lokasi pelaksanaan operasional pekerjaan/proyek berbeda provinsi/kota/kabupaten dengan Kantor Perusahaan

Untuk proyek <6 Bulan, minimal penyewaan dihitung untuk 6 Bulan

Untuk lokasi proyek terpencil/terisolir, harga dapat 1,5 s/d 2,5 kali lebih besar

M²/BulanM²/BulanM²/BulanM²/Bulan

Sewa Furniture Kantor **⁾

Untuk biaya Listrik, Air, Kebersihan, dll (termasuk perawatan)

Page 13: billing rate

� Kantor Sub Proyek Bulan 6,000,000 � Kantor Lapangan Bulan 3,750,000

6. Biaya ATK

� Kantor Utama Proyek Bulan 5,700,000 � Kantor Sub Proyek Bulan 3,450,000 � Kantor Lapangan Bulan 2,400,000

7. Biaya Komputer & Printer

� Kantor Utama Proyek Unit-Bulan 3,450,000 � Kantor Sub Proyek Unit-Bulan 2,500,000 � Kantor Lapangan Unit-Bulan 1,750,000

8. Biaya Komunikasi 4 Untuk Telepon, Fax, Internet4

Domestic :� Kantor Utama Proyek Bulan 5,700,000 � Kantor Sub Proyek Bulan 2,800,000 � Kantor Lapangan Bulan 2,300,000

International : Bulan 5,900,000

9. Tunjangan Harian 4 Berlaku hanya untuk lajang(Per Diem Allowance) 4

4

� Jakarta Org/Hari 550,000 � Provinsi Org/Hari 450,000 � Kabupaten Org/Hari 350,000

10. Tunjangan Perumahan 4(Housing Allowance)

4

(Office Consumables) **⁾

Consumables **⁾

Belum termasuk biaya pemasangan/penyambungan Telepon dan Internet

Tidak termasuk Housing Allowance

Untuk proyek ≥3 bulan, mendapat Tunjangan Perumahan

Khusus Proyek ≤3 bulan :

Untuk proyek <12 bulan, dibayar diawal proyek

Untuk proyek ≥12 bulan, dibayar disetiap awal tahun proyek

Page 14: billing rate

� Jakarta Org-Bulan 3,900,000 � Untuk Lajang'� Provinsi Org-Bulan 3,000,000 � Untuk Lajang'� Kabupaten Org-Bulan 2,600,000 � Untuk Lajang'

� Jakarta Org-Bulan 2,900,000 � Untuk Lajang'� Provinsi Org-Bulan 2,000,000 � Untuk Lajang'� Kabupaten Org-Bulan 1,700,000 � Untuk Lajang'

� Jakarta Kel-Bulan 5,500,000 � Untuk Keluarga� Provinsi Kel-Bulan 4,900,000 � Untuk Keluarga� Kabupaten Kel-Bulan 4,300,000 � Untuk Keluarga

11. Penempatan Sementara 4(Temporary Lodging)

� Jakarta Org-Hari 550,000 � Provinsi Org-Hari 450,000 � Kabupaten Org-Hari 350,000

12. Tunjangan Penempatan 4(Relocation Allowance)

� Jakarta Penugasan 17,000,000 � Provinsi Penugasan 17,000,000 � Kabupaten Penugasan 17,000,000

13. Tunjangan Tugas Luar 4(Out of Station Allowance/OSA)

� Jakarta Org-Hari 550,000 � Provinsi Org-Hari 450,000 � Kabupaten Org-Hari 350,000 � Lokasi proyek/Lapangan Org-Hari 250,000

14. Penginapan Tugas Luar 4

Proyek ≥ 3 bulan (Prof Staf) :

Proyek ≥ 3 bulan (Sub Prof) :

Proyek ≥ 12 bulan (Prof Staf) :

Untuk maksimal 3 hari setelah kedatangan di lokasi proyek

Untuk proyek ≥ 3 bulan :

Untuk biaya penyimpanan dan pemindahan perlengkapan rumah tangga

Untuk proyek ≥ 24 bulan :

Tujuan perjalanan dinas dalam kota yang sama dengan lokasi kantor

Tujuan perjalanan dinas dalam kota yang sama dengan lokasi kantor

Page 15: billing rate

� Jakarta Org-Hari 550,000 � Provinsi Org-Hari 450,000 � Kabupaten Org-Hari 350,000 � Lokasi proyek/Lapangan Org-Hari 250,000

15. Cuti Tahunan 4 Setelah bertugas 1 tahun terus menerus(Annual Leave) 4

� Jakarta Org ***) � Provinsi Org ***) � Kabupaten Org ***) � Lokasi proyek/Lapangan Org ***)

16. Biaya Laporan 4

Kantor Utama/Sub Proyek :� Laporan Pendahuluan Buku 150,000 � Laporan Antara Buku 200,000 � Konsep Lap. Akhir Buku 250,000 � Laporan Akhir Buku 300,000 � Ringkasan Eksekutif Buku 150,000 � Laporan Bulanan Buku 200,000 � Laporan Triwulan Buku 300,000 � Laporan Teknis/Khusus Buku 500,000 � Dokumen Tender Buku 6,200,000 � Manual O&M Buku 270,000 � CD Keping 20,000 � Flash Disk Buku 160,000

Kantor Lapangan :� Konsep Lap. Akhir Buku 200,000 � Laporan Akhir Buku 250,000 � Laporan Bulanan Buku 80,000 � Laporan Triwulan Buku 200,000 � Laporan Teknis/Khusus Buku 400,000

**⁾

Hanya untuk tiket pesawat (PP) dan Airport Tax

Proyek ≥ 12 bulan :

Biaya Pelaporan tergantung dari jenis, macam, bentuk, dan banyak halaman laporan. Apabila dengan gambar teknik/peta, dapat dihitung sesuai pengeluaran

Biaya Langsung Non Personil ini untuk provinsi lain (diluar DKI Jakarta) dikalikan dengan Indeks Biaya Langsung Non Personil per Provinsi (Tabel 7-11)

Page 16: billing rate

***⁾

Tabel 6B-11

dengan jumlah-harga yang pasti dan tetap serta dibayarkan sekaligus, seperti :Pengumpulan Data Sekunder

� Seminar, Workshop, Sosialisasi, Training, Desiminasi, Loka Karya, Diskusi,Koordinasi antar Instansi, FGD (Focus Group Discussion).Survey

� Biaya Test Laboratorium� dst

Bila lokasi tujuan pada saat membuat RAB/HPS sudah diketahui, Biaya Langsung Non Personil ini bisa ditentukan sebagai Fixed Unit Rate, dan bila lokasi tujuan pada saat membuat RAB/HPS belum diketahui, Biaya Langsung Non Personil bisa ditentukan sebagai At Cost.

Biaya Langsung Non Personil (Direct Cost) Tahun 2011Untuk Jenis Pengeluaran Fixed Unit Rate

Lump Sum adalah biaya suatu atau beberapa item/unsur pekerjaan dalam batas waktu tertentu,

Page 17: billing rate

KETERANGAN

Hanya untuk Mobilisasi & Demobilisasi.

Biaya untuk pengurusan Paspor, Visa, Fiskal, Sertifikat Kesehatan, dll.

Jumlah Trip Tenaga Ahli terdiri dari Mobilisasi, Perjalanan Dinas, Cuti Tahunan

Jumlah Trip Keluarga (Max. 1 Istri dan 2 Anak dibawah 18 Tahun) hanya Mobilisasi, Cuti Tahunan dan

Untuk Penerbangan Internasional, berlaku tarif IATA, kelas ekonomi.

Untuk Penerbangan Domestik, berlaku

Untuk 1 Istri, 2 Anak (belum kawin) dengan usia dibawah 18 tahun.

Untuk 1 Istri, 2 Anak (belum kawin) dengan usia dibawah 18 tahun.

Page 18: billing rate

KETERANGAN

Termasuk biaya registrasi dan asuransi

Termasuk biaya registrasi dan asuransi

Page 19: billing rate

KETERANGAN

081354076391

Untuk lokasi proyek terpencil/terisolir di suatu provinsi, harga dapat 1.5 s/d 2.5 kali

Tidak termasuk Driver untuk kendaraan

Kebutuhan ruangan rata-rata 6 M² per orang, maksimum untuk 25 orang, dan

Untuk proyek <6 Bulan, fasilitas Sewa Kantor diberikan jika lokasi pelaksanaan operasional pekerjaan/proyek berbeda provinsi/kota/kabupaten dengan Kantor

Page 20: billing rate

Untuk proyek <6 Bulan, fasilitas Sewa Kantor diberikan jika lokasi pelaksanaan operasional pekerjaan/proyek berbeda provinsi/kota/kabupaten dengan Kantor

Untuk proyek <6 Bulan, minimal penyewaan dihitung untuk 6 Bulan

Untuk lokasi proyek terpencil/terisolir, harga dapat 1,5 s/d 2,5 kali lebih besar

Untuk biaya Listrik, Air, Kebersihan, dll (termasuk perawatan)

Page 21: billing rate

Belum termasuk biaya pemasangan/penyambungan Telepon dan

Housing Allowance

≥3 bulan, mendapat Tunjangan Perumahan

Untuk proyek <12 bulan, dibayar diawal

≥12 bulan, dibayar disetiap

Page 22: billing rate

Untuk maksimal 3 hari setelah kedatangan di lokasi proyek

Untuk biaya penyimpanan dan pemindahan perlengkapan rumah tangga

Tujuan perjalanan dinas dalam kota yang sama dengan lokasi kantor

Tujuan perjalanan dinas dalam kota yang sama dengan lokasi kantor

Page 23: billing rate

Setelah bertugas 1 tahun terus menerus

Hanya untuk tiket pesawat (PP) dan

Biaya Pelaporan tergantung dari jenis, macam, bentuk, dan banyak halaman laporan. Apabila dengan gambar teknik/peta, dapat dihitung sesuai

Biaya Langsung Non Personil ini untuk provinsi lain (diluar DKI Jakarta) dikalikan dengan Indeks Biaya Langsung

Page 24: billing rate

Bila lokasi tujuan pada saat membuat RAB/HPS sudah diketahui, Biaya Langsung Non Personil ini bisa ditentukan , dan bila lokasi tujuan pada saat membuat RAB/HPS belum diketahui, Biaya Langsung

Page 25: billing rate

Tabel 7-11

Indeks Biaya Langsung Non Personil per Provinsi Tahun 2011

NO. PERSONIL INDEKS1. Nanggroe Aceh Darussalam 1.157 2. Sumatera Utara 1.005 3. Sumatera Barat 0.983 4. Riau 1.067 5. Kepulauan Riau 1.178 6. Jambi 1.028 7. Sumatera Selatan 1.007 8. Kepulauan Bangka Belitung 1.148 9. Bengkulu 1.013

10. Lampung 0.987 11. Banten 0.943 12. 1.000 13. Jawa Barat 0.963 14. Jawa Tengah 0.927 15. DI Yogyakarta 0.929 16. Jawa Timur 0.939 17. Bali 1.016 18. Nusa Tenggara Barat 1.044 19. Nusa Tenggara Timur 1.107 20. Kalimantan Barat 1.095 21. Kalimantan Tengah 1.116 22. Kalimantan Selatan 1.065 23. Kalimantan Timur 1.180 24. Sulawesi Utara 1.117 25. Sulawesi Tengah 1.063 26. Sulawesi Tenggara 1.046 27. Sulawesi Selatan 1.059 28. Sulawesi Barat 1.049 29. Gorontalo 1.064 30. Maluku 1.240 31. Maluku Utara 1.238 32. Papua 1.952 33. Papua Barat 1.516

**)(Tabel 68-11)

Indeks ini berlaku apabila pelaksanaan operasional pekerjaan, proyek

DKI Jakarta (Benchmarking)

Berlaku hanya untuk beberapa Jenis Pengeluaran Fixed Unit Rate

Page 26: billing rate

berlangsung di provinsi tersebut.